Laserfiche WebLink
I I i <br /> n <br /> I <br /> I ; and potential on-site and off-site health and environmental <br /> 2 effects ; <br /> 3 (5) A description of previous response actions; <br /> 4 (6) An identification of the general types of response <br /> 5 actions which will be evaluated in the feasibility study; <br /> 6 <br /> (7) An identification of all data gaps; <br /> 71 (8) Recommendations for additional work needed to <br /> 8 eliminate any data gaps. <br /> i <br /> 9 <br /> C. Sampling. The Workplan shall describe the activities I <br /> 10 which will be undertaken to develop a comprehensive profile of <br /> i <br /> 11 on-site and off-site hazardous chemical constituents in air, <br /> 12 soil, surface water and ground water attributable to <br /> 13 � <br /> � operations at the Site including, at a minimum, the following <br /> 14 � information: <br /> 151 (1) The objectives of the investigation; <br /> 16 (2) Identification of all chemical parameters which will , <br /> 17 be analyzed or tested; <br /> 13 (3) A description of the types of samples which will be <br /> Q <br /> 1 taken; <br /> 20 (4) A map showing all locations which will be sampled; <br /> 21 (5) A description of the depth and frequency of sampling <br /> 22 at each location including groundwater monitoring as agreed <br /> 231 on by the Parties hereto; <br /> i <br /> 24 , <br /> (6) The engineering specifications for all sampling <br /> 25 <br /> installations such as ground water monitoring wells, soil <br /> I <br /> 261 borings and piezometers; <br /> 27 <br /> (7) Identification of all analytical procedures to be <br /> I. <br /> i' <br /> ogpcq � 14 <br /> CALIFORNIA <br /> REV 13.721 <br />