Laserfiche WebLink
$66265.192 BAR-- AYS CALIFORNIA CODE OF REGULATY 'S Tide 22 <br /> tional Authorization pursuant to HSC 25200.3,and Conditional Exemp- (6)description and evaluation of any spill prevention or overfill equip- <br /> tion pursuant to HSC 25201.5,and ment <br /> (B)onground or aboveground tank systems containing RCRA hazard- (7)description and evaluation of secondary containment for the tank <br /> ous waste generated onsite,if: system(secondary containment must meet minimum standards as speci- <br /> 1.the owner or operator is a conditionally exempt small quantity gen- fied in subsections(j)(1)through(j)(3)of this section)including applica- <br /> erator as defined in 40 CFR section 261.5,or a small quantity generator ble secondary containment for ancillary equipment as required in subsec- <br /> of mom than 100 kg but less than 1000 kg per month as defined in 40 CFR don 66265.193(f); <br /> section 265.201,or (8)hazardous characteristics of the waste(s)that have been or will be <br /> 2.the owner or operator is not subject to regulation in 40 CFR pan 265 handled; <br /> pursuant to an exemption in 40 CFR section 265.1,but the owner or oper- (9)prior to placing a new tank system or component in use,an inde- <br /> ator is subject to the standards of this article. pendent, qualified installation inspector or an independent, qualified, <br /> (i)A generator or owner or operator authorized pursuant to Permit- professional engineer,registered in California,either of whom is trained <br /> by-Rule pursuant to Chapter 45 of this division,Conditional Authoriza- and experienced in the proper installation of tank systems,shall inspect <br /> tion pursuant to HSC 25200.3, or Conditional Exemption pursuant to the system or component for the presence of any of the following items <br /> HSC 25201.5,operating a non-RCRA underground tank system or an and document in writing the results of the inspection: <br /> underground tank system otherwise exempt from permitting require- (A)weld cracks or breaks; <br /> ments pursuant to the federal act,shall comply with the applicable stan- (B)scrapes of protective coatings; <br /> dards of Title 23 of the California Code of Regulations relating to under- (C)corrosion; <br /> ground tank systems. (D)any structural damage or inadequate construction or installation <br /> Q)New,ongmund or aboveground non-RCRA tank systems or tank such as cracks,punctures,damaged fittings.All discrepancies shall be <br /> systems otherwise exempt from permitting requirements pursuant to the documented in the assessment and remedied before the tank system is <br /> federal act,with secondary containment,whose design and installation placed in use. <br /> have been approved by a local agency or agencies,may,at the discretion (10)all new tanks and ancillary equipment shall be tested for rightness <br /> of the CUPA,be exempt from the engineering assessment specified in prior to being placed in use.The results of the test(s)shall be documented <br /> subsection (k)of this section,provided minimum criteria specified in in this assessment.Tank system integrity or leak test requirements must <br /> subsections 6)(1)through 0)(3)of this section are met.If the CUPA de- be in compliance with all local requirements.Prior to conducting a tank <br /> termines to exempt a new tank system from the assessment required pur- system integrity test or leak test,contact local agency staff for local re- <br /> suant to this subsection,the exemption shall be for a period of not more quirements. <br /> than three(3)years from the date the exemption was granted.The tank (11)estimated remaining service life of the tank system based on find- <br /> system owner oroperator shall submit documentation o£local agency ap- ings of subsections(k)(1)through(k)(10). <br /> proval to the applicable CUPA for review and possible acceptance in lieu (t)The assessment specified in subsection(k)of this section is not re- <br /> of the assessment speed in subsection(k)of this section.If there is no quired for the replacement of the following identical or functionally <br /> CUPA,or the CUPA requests that the Department make a determination, equivalent tank system pars or components: <br /> the documentation shall be submitted to the Department. (1)pumps(same type and capacity); <br /> (1)tank system must have secondary containment capable of contain- (2)plumbing or piping components such as unions,elbows,tees and <br /> ing 100 percent of the contents of the tank and ancillary piping volume; gaskets; <br /> and (3)valves and check valves; <br /> (2)if the tank system is exposed to precipitation,the secondary con- (4)piping and valve hangers and supports; <br /> tainment system must have sufficient capacity, in addition to that re- (m)Replacement of identical or functionally equivalent tank system <br /> quired in subsection 0)(1)of this section,to contain run-on and infiltra- parts or components not listed in subsection(1)of this section shall be ap- <br /> tion from a 25-year,24-hour rainfall event; proved by the CUPA prior to replacement or changeout.If the tank sys- <br /> (3)tank system secondary containment shall be provided with a leak tem pan or component is determined to be identical or functionally <br /> detection system that is designed and operated so that it will detect either equivalent by the CUPA,the assessment specified in subsection(k)of <br /> the failure of the primary and secondary containment structure or any re- this section is not required. The owner or operator shall provide the <br /> lease of hazardous waste or accumulated liquid in the secondary contain- CUPA,or the Department if there is no CUPA or the CUPA requests that <br /> ment system within 24 hours,or at the earliest practicable time if the ex- the Department make a determination,with the following information in <br /> isting detection technology or site conditions will not allow detection of writing so that a determination can be made: <br /> a release within 24 hours. (1)name,address,and EPA identification number of the facility; <br /> (k)The tank system assessment shall include all of the following infor- (2)daze of planned replacement; <br /> madom (3)description pan or component to be replaced; <br /> (1)tank configuration(i.e.,horizontal,vertical),material of construc- (4)description of the tank system and type of waste(s)handled; <br /> tion,and gross capacity(in gallons); (5)description of how the pan or component is identical or functional- <br /> (2)design standard(s),if available,according to which the tank and an- ly equivalent to the part or component to be replaced. <br /> ciliary equipment were or will be constructed and all of the following in- NOTE:Authority cited:Sections 25150 and 25159,Health and Safety Code.Ref- <br /> formation: erne: Sections 25159 and 25159.5,Health and Safety Code;40 CFR Section <br /> (A)material of construction; 265.192. <br /> (B)material thickness and the method used to determine the thickness; HisTonv <br /> (C)description of tanks stem piping 1.New section filed 5-24-91;operative 7-1-91(Register 91,No.22). <br /> Pu Y P P g(material,diameter); 2.New subsections(h)(1)-(h)(2)(B)2.filed 6-19-95 as an emergency;operative <br /> (D)description of any internal and external pumps;and 6-19-95(Register95,No.25).A CeriScateofCompliance mustbetrmmutted <br /> (E)sketch or drawing of tank including dimensions. to CAL by 10-17-95 or emergency language will be repealed by operation of <br /> (3)documented a of the tanks stem if tank was previously used), law on the following day. <br /> age Y ( P Y ) 3.New subsections gistcr{5,No.4 ).refiled 10-16-95 of 5 as pl emergency; mass- <br /> if available,(otherwise,an estimate of the age); five 10-16-95(Regis[er95,No.42).A Certificate ofCompliancemust be mans- <br /> (4)description and evaluation of any leak detection equipment; turned in OAL by 2-13-96 or emergency language will be repealed by opera- <br /> tion of law on the following day. <br /> (5)description and evaluation of any corrosion protection equipment, 4,New subsections(h)(1}(h)(1)(B)2.refiled 2-16-96 as an emergency;opera- <br /> devices,or material; tive 2-16-96(Register 96,No.7).A Certificate of Compliance most be mans- <br /> Page 758.84 Negour cos,No.M;9-8-2m6 <br />