My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2200 - Hazardous Waste Program
>
PR0514115
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2020 10:11:37 AM
Creation date
10/31/2018 12:45:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514115
PE
2249
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Supplemental fields
FilePath
\MIGRATIONS\C\CORRAL HOLLOW\15999\PR0514115\COMPLIANCE INFO 2015.PDF
QuestysFileName
COMPLIANCE INFO 2015
QuestysRecordDate
2/14/2018 5:54:51 PM
QuestysRecordID
3615097
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LLNL Emergency Plan <br /> Rev-23 <br /> October 2017 <br /> Emergency Services to describe the joint State and Federal response to a catastrophic earthquake <br /> in the Bay Area. This plan is a component of the Concept of Operations for the joint State and <br /> Federal response to a catastrophic incident in California. Under this plan, there are three response <br /> phases during the first 60 days after the earthquake. Activities occurring after the 60-day period <br /> are described as long-term recovery. The objectives for the three phases of response (immediate <br /> impact, sustained response, and relief) are summarized below: <br /> Immediate Impact: Earthquake (E)to E+72 Hours <br /> • Establish Interoperable Emergency Communications. <br /> • Save Lives and Protect Public Safety. <br /> • Provide Medical Care. <br /> • Establish Lines of Supply and Transportation. <br /> Sustained Response: E+72 Hours to E+14 Days <br /> • Reestablish the Medical and Public Health Systems. <br /> • Provide Care and Shelter for the Displaced Population. <br /> • Reduce Hazards to the Population. <br /> • Conduct Mass Fatality Operations. <br /> Relief: E+14 Days to E+60 Days <br /> • Provide Interim Housing for the Displaced Population. <br /> • Restore Infrastructure and Public Services. <br /> • Establish Temporary Transportation Capabilities. <br /> 1.3.4 Declaration of an Operational Emergency <br /> DOE defines an Operational Emergency as either: <br /> • A major unplanned or abnormal incident or condition that involves or affects DOE <br /> facilities and activities by causing or having the potential to cause serious health and <br /> safety or environmental impacts and requires additional resources to supplement the <br /> planned initial response; <br /> Or: <br /> • Any accident/incident involving an offsite DOE shipment containing hazardous materials <br /> that causes the initial responders to initiate protective actions at locations beyond the <br /> immediate/affected area. <br /> DOE sites/facilities must declare an Operational Emergency when incidents occur that represent <br /> a significant degradation in the level of safety at a site/facility resulting in potential health and <br /> safety hazards to workers or the public. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.