My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2200 - Hazardous Waste Program
>
PR0514115
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2020 10:11:37 AM
Creation date
10/31/2018 12:45:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514115
PE
2249
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Supplemental fields
FilePath
\MIGRATIONS\C\CORRAL HOLLOW\15999\PR0514115\COMPLIANCE INFO 2015.PDF
QuestysFileName
COMPLIANCE INFO 2015
QuestysRecordDate
2/14/2018 5:54:51 PM
QuestysRecordID
3615097
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LLNL Emergency Plan <br /> Rev-23 <br /> October 2017 <br /> Table 2.1 Emergency Operations Center Activation Status Level <br /> Status Level Staffing Activities Notes <br /> Stand-by N/A None No activities in EOC. This is the normal workday <br /> EOC equipment, configuration and status for <br /> systems are off,but the EOC. <br /> are available for <br /> operations. <br /> Monitor N/A None;however, EOC is not Examples: Protest <br /> ERO staff or LEDO operational,use of demonstration,planned <br /> may be present to plans/procedures or LLNL event(e.g.,National <br /> monitor situation. Emergency Plan is Ignition Facility <br /> not necessary. Dedication,Family Day). <br /> EOC equipment, <br /> systems are turned on <br /> and may be used. <br /> Activated Key Staff ED,Liaison Officer, EOC can be declared Examples: Severe weather <br /> Public Information operational. advisory, earthquake <br /> Manager(PIM), advisory, local building <br /> EMC, Operations Minimal operations to power failure, security <br /> Chief,Planning& support response in event, Operational <br /> Intelligence(P&I) accordance with Emergency. <br /> Chief, CQT Team plans/procedures and <br /> Lead Emergency Plan as <br /> appropriate. <br /> Key Staff- Key Staff plus EOC operated in Examples: Moderate <br /> Additional appropriate accordance with earthquake (no <br /> Staff additional staff plans/procedures and Disaster/Self-Help Program <br /> Emergency Plan. activation), Site 300 <br /> wildfire,major storm, site- <br /> wide power outage, security <br /> event, Operational <br /> Emergency or Alert. <br /> Activated Full Staff All EOC positions EOC and ERO Examples: Major LLNL or <br /> staffed operate in accordance regional event,earthquake <br /> with plans/procedures and Disaster/Self-Help <br /> and Emergency Plan. Program activation, security <br /> event, Site Area Emergency <br /> or General Emergency. <br /> 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.