Laserfiche WebLink
I <br /> Ms. Lori Duncan . <br /> January 11, 2005 <br /> Page 7 of 7 } <br /> Permitting and Schedule <br /> e I <br /> i <br /> A well construction permit and associated fees will be submitted under separate cover subsequent <br /> 4 <br /> to approval of this workplan. <br /> Reporting <br /> A technical report describing the methods and results of the investigation proposed herein will be <br /> submitted to EHD. The report will include recommendations.as appropriate. Ground Zero intends <br /> to pursue site closure as a low-risk groundwater contamination case if contaminant concentrations <br /> are below MCLS in the confirmation groundwater samples collected from the proposed wells. <br /> Please contact Ground Zero at your earliest convenience if you have any questions or comments <br /> regarding this report. <br /> Respectfully, <br /> Ground Zero Analysis Inc. <br /> seph L. Vasquez <br /> Staff Geologist '�� JOLl�l P. <br /> NC795 _ <br /> John P. Lane, <br /> CA Registered Geologist No. 6795 <br /> i <br /> 1 Attachments <br /> cc: Mr. Martin Harris,Tuff Boy Trailers <br /> s Ms. Karen Collins,Environmental Closures <br /> Mr. James L.L. Barton, CRWQCB, Central Valley Region <br /> 1 <br /> t <br /> } <br /> G:IGROU NDZE1TuffBoy\Reports\WorkplanslW P1204-doe <br /> it P <br /> i� l; <br />