Laserfiche WebLink
\.r$ <br /> Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> Physical Hazards <br /> :.._Task(sJ ' Hazard. .. .... ...... Mitigation Measure <br /> 1,2 Heavy Equipment (Noise & Physical All heavy equipment used on this project will be <br /> contact) in good working order and operated in accordance <br /> with recognized industry standards and Cal- <br /> OSHA Title 8, Subchapter 4, Construction Safety <br /> Orders. In addition, an exclusion zone applies to <br /> all personnel. The exclusion zone will be 20 feet <br /> to the front and either side of the operating drill <br /> rig. Personnel will not be allowed under booms or <br /> augers at any time. <br /> All equipment operators and ground crews <br /> working in close proximity of heavy equipment <br /> will be supplied with ear protection, <br /> 1,2 Dust The dust hazard will be mitigated by not allowing <br /> ground crew to be located down wind of drilling <br /> and excavation activity. In addition, water will <br /> be applied to control the dust if visible levels of <br /> dust are generated. <br /> Fire and Explosion Hazards <br /> List Flammable or Combustible materials on-site. Keep sources of ignition away from these <br /> materials. <br /> Flammable (Flash Point <100 °F) Combustible (Flash Point <20000 <br /> Gasoline <br /> Type and Location of Fire Extinguishers (Show on map for large projects) <br /> Dry chemical fire extinguishers, Class A, B, and C, are stored in all GZ,4 vehicles. <br /> PAGE 4 <br />