My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALMONDWOOD
>
5151
>
3500 - Local Oversight Program
>
PR0543386
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2018 2:55:42 PM
Creation date
10/31/2018 2:20:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543386
PE
3528
FACILITY_ID
FA0003791
FACILITY_NAME
TUFF BOY INC
STREET_NUMBER
5151
STREET_NAME
ALMONDWOOD
STREET_TYPE
DR
City
MANTECA
Zip
95337
APN
22606017
CURRENT_STATUS
02
SITE_LOCATION
5151 ALMONDWOOD DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> t <br /> Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> 3 <br /> PERSONALt ROTECTIVE EQUIPMENT <br /> ii <br /> As a minimum Level D protection is required on all GZA work sites. Level D includes: <br /> :i <br /> ✓ Steel toed boots <br /> ✓ Safety Glasses ij <br /> ✓ Hard Hat d <br /> li <br /> For each task on this project, identify additional protective garments as required, include the <br /> conditions under which the level of PPE would be modified for each task. <br /> d <br /> Task{s} .. Co.r�d�t�on . Personnel „Garment(s.:. l,, .`.' <br /> .. <br /> None Working Near Vehicle Orange Vests <br /> 1,2 X20 ppm for 5 minutes '" 1/2 Face Respirator <br /> 1,2 >200 ppm for 5 minutes Evacuate Site Full Face Respirator <br /> i <br /> ii <br /> SITE CONTROL AND COMMUNICATIONS <br /> The buddy system must be used on all GZA hazardous waste sites. <br /> Site will be secured as follows: Fencing will be used when possible. <br /> .i <br /> +' Work Zones will be marked as follows: Barricades and caution tape will be used to mark off <br /> work zone. <br /> t <br /> E �1 <br /> MARK WORK ZONES ON SITE MAP ❑CHECK WHEN DONE <br /> i <br /> i PAGE 7 <br /> I� <br /> l IL <br />
The URL can be used to link to this page
Your browser does not support the video tag.