My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALMONDWOOD
>
5151
>
3500 - Local Oversight Program
>
PR0543386
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2018 3:08:08 PM
Creation date
10/31/2018 2:21:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543386
PE
3528
FACILITY_ID
FA0003791
FACILITY_NAME
TUFF BOY INC
STREET_NUMBER
5151
STREET_NAME
ALMONDWOOD
STREET_TYPE
DR
City
MANTECA
Zip
95337
APN
22606017
CURRENT_STATUS
02
SITE_LOCATION
5151 ALMONDWOOD DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Case Closure Summary Page 2 � <br /> Leaking Underground Fuel Storage Tank Program <br /> III. Release and Site Characterization Information (continued) <br /> Maximum Documented Contaminant Concentrations - -Before and After Cleanup : <br /> Contaminant Soil Before (ppm) Water (ppm) I Contaminant Soil Before (ppm) Water (ppm) <br /> After Before After . After Before After <br /> TPH(Gas) 630 24 8.0 0.064 Xylenes ; 13.0 0.2 0.20 <0.001 <br /> TPH (Diesel) NA NA NA NA Ethylbenzene 2.9 <0.1 0.064 <0.0005 <br /> Benzene 1.4 <0.1 0.013 <0.0005 Oil&Grease NA NA NA NA <br /> Toluene 1.3 <0.1 <0.0025 <0.0005 Heavy Metals NA NA NA NA <br /> MTBE <0.5 . <0.050.016 0.0053 <br /> I <br /> Comments: SOIL 'BEFORE' DATA FROM TANK REMOVAL OR INITIAL SOIL BORING SAMPLES FROM TANK PIT <br /> AREA; SOIL 'AFTER' DATA FROM BORINGS FOR MONITORING WELL MW-7 LOCATED IN TANK PIT AREA. <br /> WATER BEFORE' DATA FROM SOIL BORING GRAB SAMPLE AND INITIAL GW MONITORING SAMPLES; WATER <br /> 'AFTER' DATA FROM THE MOST RECENTLY REPORTED GW MONITORING EVENT. <br /> .IV. Closure <br /> Does completed corrective action protect existing beneficial uses per the Regional Board Basin Plan?YES <br /> Does completed corrective action protect potential beneficial uses per the Regional Board Basin Plan? YES <br /> Does corrective action protect public health for current land use? YES <br /> Site management requirements: NONE <br /> Should corrective action be reviewed if land use changes?YES <br /> Monitoring/Vapor wells decommissioned: YES Number Decommissioned:' 11 Number retained: 0 <br /> 1 <br />! List enforcement actions taken: NOR <br /> i List enforcement actions rescinded: NONE <br /> V. Local Agency Representative Data <br /> ,9 <br /> Name: DONNA HERAN, REHS Title: DIRECTOR, ENVIRONMENTAL HEALTH DEPT. <br /> Signature: Date: <br /> VI. Central Valley Regional Water Quality Control Board (RB) Notification <br /> Ji- <br /> Date Submitted to RB: 03/16/06 Response Date: 05/08/06 <br /> RB Staff: JAMES L.L.BARTON Response: CONCURRENCE <br /> Title: ENGINEERING GEOLOGIST (' <br /> VII. Additional Comments, Data, etc. <br /> I This document and the related CASE CLOSURE LETTER, Shall be retained by the lead agency as part of the official <br /> site file. <br />
The URL can be used to link to this page
Your browser does not support the video tag.