My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALMONDWOOD
>
5151
>
3500 - Local Oversight Program
>
PR0543386
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2018 3:08:08 PM
Creation date
10/31/2018 2:21:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543386
PE
3528
FACILITY_ID
FA0003791
FACILITY_NAME
TUFF BOY INC
STREET_NUMBER
5151
STREET_NAME
ALMONDWOOD
STREET_TYPE
DR
City
MANTECA
Zip
95337
APN
22606017
CURRENT_STATUS
02
SITE_LOCATION
5151 ALMONDWOOD DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HEALTH SERVICES FILE <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DIVISIONY <br /> Karen Furst, M.D., M.P.H., Health Officer <br /> LlFOR - <br /> 304 East Weber Avenue, Third Floor ' Stockton, CA 95202 <br /> 209/468-3420 <br /> MARTIN HARRIS AUG 2 5 2000 <br /> 5151 ALMONDWOOD DRIVE <br /> MANTECA CA 95337 <br /> i <br /> RE: Tuff Boy Trailers SITE CODE: !E 1424 <br /> 5151 Almondwood Drive. <br /> Manteca CA 95337 I <br /> h <br /> WORK PLAN: Work Plan for Groundwater Monitoring Well Installation <br /> i,� � <br /> ;} <br /> DATED: August 10,2000 <br /> PREPARED BY: Ground Zero Analysis,Inc. t <br /> APPROVED x <br /> DISAPPROVED <br /> ADDENDUM NEEDED Submit by <br /> I� <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN JH&S 25299.37,subd(c)(3)]: <br /> 1. Installation of four monitoring wells to first groundwater. <br /> 2. Soil samples will be analyzed for TPH gas,BMX and MtBE (EPA 8020). Positive results of MTBE will be <br /> confirmed by EPA Method 8260. M <br /> 3. Following installation(minimum 24 hours)the well casings will be surveyed and the wells will be developed and <br /> { sampled. The water samples will be analyzed for TPH gas(EPA 801$m),BTEX(EPA 8020) and fuel oxygenates, <br /> EDB and 1,2-DCA(EPA 8260). <br /> 4. Following completion of the fieldwork a report of findings will be submitted'to PHS/EHD which will include <br /> conclusions and recommendations. ;j <br /> COMMENTS AND CONDITIONS: <br /> 1. Please proceed with submittal of a well permit application and required$89.00 permit fee to PHS/EHD. <br /> 2. Forty eight hours notice to PHS/EHD is required prior to initiating fieldwork <br /> DATED! -Z-5 g-0 BY <br /> Lori DuncanSensor RENS 209 468-0337 <br /> i{ <br /> i cc: Marty Hartzell,CVRWQCB <br /> John Lane,Ground Zero Analysis,Inc. <br /> l <br /> A Division of San Joaquin County Health Care Services <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.