Laserfiche WebLink
1 <br /> WORK REQUEST FORM <br /> Date of Request 01/21/04 Requested Completion Date 01/23/04 <br /> Proj Name Tuff Boy Trailers Prol No 335 <br /> Site Address 5151 Almondwood Manteca, CA Task none <br /> Project Manager John Lane Field Tech A Scoma <br /> Client Contact Josh/Amy Phone No 239-1361 <br /> Regulatory Contact Lori Duncan Phone No 468-0337 <br /> Approval Z► Completion Date DI IX3 81,1 0,4 CAC <br /> READ AND UNDERSTAND THIS WORK REQUEST PRIOR TO ARRIVING ON SITE <br /> The scope of work will consist of developing and sampling two 2-inch wells an one 3/4-inch well <br /> Potenrtal chemical hazards include gasoline constituents including MTBE Items to bring to site <br /> include centrifugal pump and tubm bailers sample bailers water level probe and field meters <br /> ice chest with ice, 2 drums Keep in mind that one well is 1/2-inch to 3/4-inch in diameter Be sure <br /> . you have qppropnatetubing to develop the well <br /> Measure DTW/DTB in each site well DTW was approximately 6 5-7 5 feet below ground <br /> surface in December Momtoirng order is MW4 MW6 MW5 MW2 MW3 MW1 MW7 <br /> Develop and sample new wells in order The order is MWS, MW5, MW7 Wells_ are <br /> approximately 19 feet bas Wells MW5 and MW6 are 2-inch diameter and well MW7 is small <br /> diameter (V2-inch to 3/4-inch <br /> Measure water parameters (pH conductivity, temp . turbidit) Make sure you follow our decon <br /> protocols all downhole equipment between wells <br /> Sam le all wells for TPHG/BTEX EPA 8015B/8021B and oxvaenates EDB 1 2-DCA <br /> ethanol. methanol EPA 8260B Send samples to Argon Labs for analysis Need EDF <br /> results <br /> Take a detailed drum count of all water filled drums Make sure all drums are labeled <br />