Laserfiche WebLink
LJ <br />1W <br />GENERAL BUFFER ZONE REQUIREMENTS <br />A bufferzone must be established forevery fumigant application. The following describes <br />the general buffer zone requirements: <br />• An area established around the perimeter of each application block. The buffer zone <br />must extend outward from the edge of the, application block perimeter equally in all <br />directions. <br />• All non -handlers, Including field workers, residents, pedestrians, and other bystanders, <br />must be excluded from the buffer zone during the buffer zone period except for transit <br />(see Buffer2one Exemptions for Transit on Roadways). <br />• Local, state, or federal officlals performing inspection, sampling, or other similar <br />official duties are not excluded from the application block or the buffer.zone by <br />this labeling. The certified applicator supervising the application and the owner of <br />the establishment where the application is taking place are not authorized to, or <br />responsible for, excluding those officials from the application block or the bufferzone. <br />• The bufferzone period begins at the start of the application and lasts for a minimum <br />of 48 -hours after the application Is complete. <br />Buffer Zone Proximity <br />• Before the start of application, the certified applicator must determine whether their <br />buffer zone will overlap any me.tam sodium or metam potassium (or other MITC <br />generating pesticides) buffs(zone(s). <br />• To reduce the potential for off -0a movement from multiple fumigated fields, buffer <br />.zones from multiple metam sodium or metam potassium (or other MITC generating <br />pesticides) application blocks must not overlap UNLESS: <br />1. A minimum of 12 hours have elapsed from the time the earlier application(s) is <br />complete until the start of the later application, and <br />2. Fumigant Site Monitoring or Response Information for Neighbors have been <br />implemented if there are any residences or businesses within 300 feet of any of <br />the buffer zones. <br />In addition, only for Low Release Height -Solid Stream Center Pivot Applications: <br />• Before the application begins, the certified applicator must determine whether the <br />application block or its resulting buffer will overlap with a buffer that is already in <br />effect. <br />• To reduce the potential for off-site movement from multiple. fumigated fields, buffer <br />zones from multiple metam sodium or metam potassium application blocks may not <br />overlap UNLESS: <br />a [loth application blocks are treated using low release height -solid stream center <br />pivot systems. The 12 hour waiting period does not apply in this instance. <br />NOTE: Under this exception, buffer zones may only overlap with those from <br />application blocks that are not within the same field P.a., application blocks must <br />be in separate fields that are treated with a different center pivot rig also equipped <br />with low release height etc.). For buffers from application blocks within the same <br />field to overlap, 12 hours must elapse from the completion of the first application <br />until the start of the subsequent application. <br />o Fumigant Site Monitoring or Response Information for Neighbors have been <br />implemented if there are any residences or businesses within 300 feet of any of <br />the buffer zones. <br />Structures Under The Control Of The Owner Of The Application Block <br />• Buffer zones must notinciude buildings used forstorage (e,g, sheds, barns, garages), <br />UNLESS: <br />o. The storage buildings are not occupied during the bufferzone period, and <br />o The storage bulidngs'do not share a common wail with an occupied structure. <br />Areas Not Under The Control Of The Owner Of The_Application Block <br />• Buffer zones must not include residential areas (e.g., employee housing, private <br />Property), buildings (e.g., commercial, industrial), outdoor residential areas (e.g., <br />awns, gardens, play areas) and other areas that people may occupy, UNLESS: <br />1. The occupants provide written agreement, priorto the start of the application, that <br />they will voluntarily vacate the buffer zone during the entire. bufferzone period, and <br />2. Reentry by occupants and other non -handlers must not occur until, <br />o The bufferzone period has ended, and <br />o Sensory irritation is not experienced upon re-entry. <br />• Buffer zones must not include agricultural areas owned and/or operated by persons <br />otherthan the owner of the application block, UNLESS: <br />1. The owner of the applicatPon block can ensure that the buffer zone will not overlap <br />with a metam sodium or metam potassium (or other MITC generating pesticides) <br />buffer zone from any other property owners, except as provided In the Buffer Zane <br />Proximity section, and <br />2. The owner of the other property provides written agreement to the applicatorthat <br />they, their employees, and other persons will stay out of the buffer zone during the <br />entire buffer zone period. <br />• Buffer zones must not include roadways and rights of way UNLESS: <br />Sedag=42_20.13:mdd 15 <br />� 01 01a <br />1. The area is not occupied during the buffer zone period, and <br />2. Entry by non -handlers is prohibited during the buffer zone period. <br />Buf erzone Exemotions forTransit on Roadways. <br />Vehicular and bicycle traffic on public and private roadways through the buffer <br />zone is permitted. (NOTE: Buffer zones are not permitted to include.bus stops <br />or other locations where persons waitfor public transit.) <br />• For all otherpublicly owned and/or operated areas such. as parks, sidewalks, <br />permanent walking paths, playgrounds, and athletic fields, buffer zones must not <br />Include these areas UNLESS: <br />1, The area is not occupied during the buffer zone period, <br />2. Entry by non -handlers is prohibited during the buffer zone, period, and <br />3: Written permission to include the public area In the buffer zone is granted. by <br />the appropriate state and/or local authorities responsible for management and <br />operation of the area <br />Certified applicators must comply with all local laws and regulations. <br />See the Postingsection for additional requirements that may apply. <br />BUFFER ZONE DISTANCES <br />Buffer, zone distances must be calculated using the application rate and the size of the <br />application block. <br />• Buffer zone distances must be based on look -up tables in this labeling (25 feet is <br />the minimum distance regardless of site-speclfic.appiication parameters). <br />• If after applying all applicable bufferzone credits the bufferzone is greater than A <br />mile (2,640 ft), then the application is prohibited. <br />Tables 1-12 as appropriate forthamethod of application must be used to determine <br />the minimum buffer distances. Round upto the nearest ratwand block size, where <br />applicable. Applications are prohibited for rates or block sizes that exceed what is <br />presented in the buffer zone tables. <br />Wj <br />6/12/2015 10:25:54 AM <br />`W -A <br />1. The area is not occupied during the buffer zone period, and <br />2. Entry by non -handlers is prohibited during the buffer zone period. <br />Buf erzone Exemotions forTransit on Roadways. <br />Vehicular and bicycle traffic on public and private roadways through the buffer <br />zone is permitted. (NOTE: Buffer zones are not permitted to include.bus stops <br />or other locations where persons waitfor public transit.) <br />• For all otherpublicly owned and/or operated areas such. as parks, sidewalks, <br />permanent walking paths, playgrounds, and athletic fields, buffer zones must not <br />Include these areas UNLESS: <br />1, The area is not occupied during the buffer zone period, <br />2. Entry by non -handlers is prohibited during the buffer zone, period, and <br />3: Written permission to include the public area In the buffer zone is granted. by <br />the appropriate state and/or local authorities responsible for management and <br />operation of the area <br />Certified applicators must comply with all local laws and regulations. <br />See the Postingsection for additional requirements that may apply. <br />BUFFER ZONE DISTANCES <br />Buffer, zone distances must be calculated using the application rate and the size of the <br />application block. <br />• Buffer zone distances must be based on look -up tables in this labeling (25 feet is <br />the minimum distance regardless of site-speclfic.appiication parameters). <br />• If after applying all applicable bufferzone credits the bufferzone is greater than A <br />mile (2,640 ft), then the application is prohibited. <br />Tables 1-12 as appropriate forthamethod of application must be used to determine <br />the minimum buffer distances. Round upto the nearest ratwand block size, where <br />applicable. Applications are prohibited for rates or block sizes that exceed what is <br />presented in the buffer zone tables. <br />Wj <br />6/12/2015 10:25:54 AM <br />`W -A <br />