Laserfiche WebLink
90 Day Accumulation in Tanks (•. <br />external(Section 66262.34) <br />If an _ is the secondary <br />.. - .. - <br />capacity(A) Designed and to contain 100% of the <br />of the largest awithin its boundary�_ <br />(B) Designed and operated prevent run-on and <br />infiltration of p <br />,=Ipitat' it has <br />excess capacity to .. .; <br />infiltrationfrom - <br />(C) Free of cracks and OPS <br />Designed _. <br />and to cover all surp6unding - <br />into contact with th& waste if rel. <br />WqdLo'11MWV- <br />If a vault system, is the secondary containments <br />(66265.193 (e) (2) -] <br />infiltration(A) Designed and operated to contain 100% of the <br />capacity of the largest tank within its boundary -i <br />(B) Designed and operated to prevent run-on and <br />of precipitation unle <br />infiltrationexcess capacity to contain run-on and <br />from -.24-hcur rainfall <br />stops(C) Constructed with chemical resistant water <br />at any joints? <br />waste(D) Provided with an impermeable interior <br />coating or lining that is compatible with waste <br />in tank(s) and that will prevent migration of <br />into - concrete? <br />Provided with meansto protect against- <br />formation of and ignition of vapors within the <br />vault if the waste is ignitable(per 66261.21) <br />or reactive (per 66261.23) and may form an <br />ignitable or explosive vapor? <br />(F) Provided with an exterior moisture barrier <br />or otherwise designed or operated to prevent <br />migration of moisture into the vault if subject <br />to hydraulicpressure? <br />Revised 7/15/91 Page 15 <br />1 <br />L <br />