i
<br /> SAN JOAQUTAOUNTY ENVIRONMENTAL HEALIOEPARTMENT
<br /> 600 E. Main St. • Stockton, CA 95202-3029 • Phone(209)468-3420
<br /> Donna Heran,R.E.H.S., Director
<br /> ENVIRONMENTAL HEALTH
<br /> SAN JOAQUIN COUNTY CERTIFIED UNIFIED PROGRAM AGENCY
<br /> PERMIT TO OPERATE
<br /> Progra Permit-
<br /> --
<br /> _Pro am Code and Description Perm,
<br /> rdID Number gC P Valid
<br /> �PR0513780 PT0009975 2220-SMALL QUANTITY HAZARDOUS WASTE GENERATOR FACILITY 1/1/2010 To 12/31/2010
<br /> -Hazardous-Waste Generator Program-
<br /> In order to maintain the permit to operate,Hazardous Waste Generators shall comply with California Health and Safety Code,Div.20,Chap.6.5,Art.2.13,
<br /> Sec.25100 at seg,and Title 22,California Code of Regulations,Chap.20,
<br /> PR0231631 2300-UNDERGROUND STORAGE TANK FACILITY 111/2010 To 12/31/2010
<br /> Underground Storage Tank Program-
<br /> California Health and Safety Code, Div.20,Cha .67 and Title 23,California Code of Regulations,Chap; 16_ __
<br /> -- ------- ------ -------------------------------------- --------------------- -------- --
<br /> P/E Tank# Tank Record ID Permit# Capacity Contents Permit Status System Type Leak Detection
<br /> 2362 4 390002316310163104 PT0004141 12,000 REGULAR UNLEADED Active,billable DOUBLE WALLED Continuous Interstitial Monitoring
<br /> 2360 5 390002316310163105 PT0004142 10,000 DIESEL Active,billable DOUBLE WALLED Continuous Interstitial Monitoring
<br /> 2360 6 390002316310163106 PT0004143 6,000 PREMIUM UNLEADED Active,billable DOUBLE WALLED Continuous Interstitial Monitoring
<br /> Underground Storage Tank Permit Conditions
<br /> I) The Permit to Operate will become void if Annual Permit Fees and Service Fees are not paid and/or the UST system(s)fails to remain in compliance with these Permit Conditions.
<br /> 2) In order to maintain the operating permit,the owner and operator shall comply with the H&S Code,Div.20,Chap.6.7 and 6.75;and CCR,Tide 23,Chap.16 and 18,as well as any conditions
<br /> established by San Joaquin County.
<br /> 3) If the Tank Opemtor(s)is different from the Tank Owner,or if the Permit to Operate is issued to a person other than the owner or operator of the tank,the Permittee shall ensure that both
<br /> the Tank Owner and tank Operator receive a copy of the permit.
<br /> 4) Written Monitoring Procedures and an Emergency Response Plan must be approved by the Environmental Health Departrnem(EHD)and are considererd UST Permit Conditions. The approved
<br /> monitoring,response,and plot plans shall be maintained onsite with the permit
<br /> 5) The Permittee shall comply with the monitoring procedures referenced in this permit.
<br /> 6) The Permittee shall perform testing and preventive maintenance on all leak detection monitoring equipment annually,or more frequently if specified by the equipment manufacturer,and
<br /> provide documentation of such servicing to this office.
<br /> 7) In the event of a spill,leak,or other unauthorized release,the Permitee shall comply with the requirements of Title 23 CCR,Chap. 16,An.5,and the approved Emergency Response Plan.
<br /> 8) Written records of all monitoring performed shall be maintained on-site by the operator and be available for inspection for a period of at least three years from the date the monitoring was
<br /> performed.
<br /> 9) The EHD shall be notified of any change in ownership or operation of the OST system within 30 days of such change.
<br /> 10) Upon any change in equipment,design or operation of the UST system(including change in tank contents or usage),the Permit to Operate will be subject to review,modification or
<br /> revocation.
<br /> 11) Construction,repair and/or removal permits are required from the EHD prior to any change,repair or removal of UST system equipment
<br /> 12) The Permittee shall submit an annual report documenting compliance with the UST Permit Conditions within 30 days of the date of the issuance of this permit.
<br /> 13) This Persil to Operate shall not be considered permission to violate any laws,ordinances or statutes of any other Federal,State or Local agency.
<br /> 14) A"Conditional'Permit may be revoked if corrections specified on the inspection report are not completed by the dale(s) indicated.
<br /> PERMITS TO OPERATE are NOT TRANSFERABLE
<br /> and may be SUSPENDED or REVOKED for cause.
<br /> PERMIT(s)Valid only for: TOWER ENERGY GROUP
<br /> THIS FORM MUST BE DISPLAYED CONSPICUOUSLY ON THE PREMISES
<br /> Regulated Facility: TOWER MART#876 Facility ID FA0000091
<br /> 14000 E HWY 88 Account'D AR0000090
<br /> LOCKEFORD CA 95237 Issued 2/10/2010
<br /> Billing Address: ATTN : TOWER ENERGY GROUP
<br /> TOWER MART #876
<br /> 1983 W190TH ST STE 100
<br /> TORRANCE CA 90504
<br /> 7023.rpt
<br /> I
<br />
|