Laserfiche WebLink
• 0- <br />209-4-e7-2440 <br />205--4-e x--2444 W. T. HULL $ CC--- PME 176 POS OCT 25' 93 08-.:3, <br />dt"L" 9G�lNCE YLO GlpMk' CIIZ <br />ftme U Falvil"M Mial Assft mora Motu d pmposa] <br />1 <br />43 Franc West Ctftle - Stockt—, CA <br />Odobex 21, 7.993 <br />Page 3 <br />Task 5 _ Di3powl Of Liquid Chemicals and Rinsate <br />Material Safety Data Sheets and Haz Cat field screening results developed <br />dwing Task l will be used to prepare a waste ,profile description of the hquid <br />chemicals and rinsate pumped from the three sumps and the vats located in the <br />Plating Raorn_ 'Phis profile will be submitted to the selected recycling or disposal <br />facility to obtain #heir acceptance for handling the waste. C.K.C. estimates that two <br />or three weeks will be regained for the selected facility's review and acceptance of the <br />waste. <br />Task 6 - Inspection and Monitoring <br />ASE will conduct visual inspections of the Plating Room sump to verify the <br />integrity of the Concrete and determine the need for soil samples. ASE will also <br />provide inspection and Monitoring services during the course of Tasks I - 5. <br />Task 7 - Soil Sampling <br />contaminated <br />will core through the concrete sump flow in the Plating Room and the oil <br />asphalt surface near the facility boilers, as required, to allow for visual <br />and olfactory observations of the soil for the presence of subsurface contamination <br />from chemical spills or leaks. ASEwill bore into the soil and collect soil can, to <br />verify possible contamination and quantfy chetr�dcal concentrations, if present The <br />samples will be transported to a stage certified laboratory for analysis. <br />For the purpose of estimating a budget for this project, it is assumed that a <br />maximum 4tif77 nail samples will be analyzed for pH, copper. chroTniurn, and lea <br />and a maximum 4 sail samples will be analyzed for grease and oil. The actual <br />extent of saxZtpling and analysis will depend, in part, on the results obtained from the <br />visual and olfactory observations of the soil and from project inspectiazt and <br />monitoring, If additional samples are required as a result of the findings of the initial <br />analysis, collection and analysis costs will be billed on a time and materials basis in <br />accordance with the ASE Rate Schedule (Attachment 2). <br />ASE will document the res Task - Itstofgthe Phaw hnvironmental Ass <br />written report to the Client, irtcludiztg: a s�� a es$nlent in a <br />recommendatkms for further action if ne activities, conclusions, � <br />cessary_ <br />£O 'd 1.£:e1 NOW H -K-100 <br />