Laserfiche WebLink
0 0 <br />209---477-2440 W- T. HULL- #3. cO. FME 176 P07 OCT <br />io 7,`1�C1.1Hp �IC!K>➢EIlw31Mq <br />Phase Ii l nwironm�rrtal'Assessment Modified FuTosa] <br />152 Frank West C'Wle - Stockt*n, CA Page 5 <br />October 21, 19,93 <br />Qst Estimate <br />ASS estimates that the tasks outlined in this prapos�al can be cMpleted for a <br />fee of $115,055.00 (Attachment 1). ASE wishes.. to emphasize that this is a cast <br />or126tafte d p is not a firm Offer to complete the Phase 11 Envimnmentat Assam <br />far a fixed price. tt is offered as a best estimate Of what the proiect sh"d cast but <br />a]I billings wauid be an a -tinie and materials basis in accordance with the ASF Date <br />Schedule (Attachment 2) and the ICKC. Rate Schedule (Attadinent 3). <br />The cost esftate is based ori the <br />reimbursement from the dent for services rc�vidcd that ASF wiII receive direct <br />laboratory, and that the Cliertt will directly provided <br />with C.1C.0 fSE azId ortheo subcontract <br />t of Tasks T - 5 of the project. if this isnot satisfaeto ASE i <br />to Sutbcontract C.K.C.•s services far an increased fee equal to 15%tisf of Cf A -SE s willing <br />Sincerely, g <br />41-p— C <br />Kyle C. West, MS, PEA <br />Senior Enginm <br />Attachments <br />cc: Mr. Jeff Heitman, Property M=aLgement <br />Experts <br />SQ 'd 8E : 7U [ NOW £8 -SZ -100 <br />