Laserfiche WebLink
0 <br />Yes No Comment <br />Scoping of Checklist <br />Does the facility generate a RCRA <br />regulated hazardous waste? <br />If no, omit pages 16 through 19, and questions with no State section cited. <br />Does the generator qualify as a RCRA <br />conditionally exempt small quantity <br />generator by: <br />Generating less than 100 kg/mo, and <br />/ <br />accumulating less than 1000 kg of RCRA <br />H.W. on site? [-/261.5(a),(g)] or: <br />Generating and accumulating less than <br />1 kg. of RCRA acute H.W., or 100 kg of <br />RCRA acute H.W. contaminated soil or <br />spill residues? [-/261.5(e)(1-2)] <br />Does the facility generate between 100 <br />and 1000 kg of RCRA non-acute* H.W. per <br />month, and never accumulate more than <br />6000 kg of H.W. on site? <br />* Generators of more than 1 kg/mo, or who accumulate more than 1 kg at any <br />time, of RCRA acute H.W. (listed in 261.33(e)) are fully regulated RCRA <br />generators. (Reference -/261.5(f)(2)) <br />�ll�� �� X*rzz <br />/ <br />Does the generator accumulate RCRA <br />regulated H.W. onsite in tanks? 4/ <br />/ <br />If yes, add Part 265, Subpart J checklist. <br />Is the facility a farmer generating <br />waste pesticide(s)? _ <br />If no, omit page 15. /) <br />Has the generator exported H.W. in the / <br />last 3 years? <br />— <br />If no, omit pages 16 through 20. <br />NOTE: This page is designed to help you identify non -applicable sections of <br />the checklist. A "No" answer on this page does not indicate a violation. <br />Page 2 <br />