Laserfiche WebLink
Yes No Comment <br />Generation Points ("Satellite") <br />The generator may accumulate H.W. at or <br />near the point of initial generation <br />without meeting storage deadlines if: <br />They accumulate no more than 55 <br />gallons of H.W. or one quart of acutely <br />or extremely H.W.? <br />(25123.3(d)(1)/262.34(c)(1)] <br />The waste is stored in containers? <br />[25123.3(d)(2)/-] <br />The waste is stored for no more <br />than one year, nor more than 90 days <br />from reaching the quantity limits? <br />(25123.3(d)(3)/-] <br />The container is labelled with the <br />initial date of accumulation and with <br />the words "Hazardous Waste" or other <br />words identifying the contents? <br />[25123.3(d)(4)/262.34(c)(1)(ii)] <br />Within three days of reaching any <br />quantity limit above, has the generator <br />labelled the container with the date <br />the quantity limit was reached and <br />complied with 66508(a)/262.34(a)? <br />[25123.3(d)(5)/262.34(c)(2)] <br />The container is in good condition, <br />is compatible with the waste, is kept <br />closed when H.W. is not being added or <br />removed? <br />[25123.3(d)(6)/262.34(c)(1)(i)] _ <br />They are not otherwise a storage <br />cacility? (25123.3(d)(7)/-] _ <br />90 Cay Storage <br />If the generator does not have interim <br />status (as a TSD facility) have they <br />accumulated H.W. on-site for less <br />than 90 days? (66508(a)/262.34(a)] <br />NOTE: For generators of less than 100 kg/mo., the 90 days starts when <br />100 kg has been accumulated. (Reference 25123.3/-) <br />Page 6 <br />