Laserfiche WebLink
0 0 <br />Yes No Comment <br />Contingency Plan and Emergency Procedures - Continued <br />Has the plan been reviewed and immediately <br />amended whenever: (67143-/265.54-] <br />(b/a) Applicable regulations are <br />revised? — <br />(c/b) The plan fails in an emergency <br />(d/c) Facility changes require it? _ <br />(e/d) The list of emergency <br />coordinators changes? <br />(f/e) The list of emergency equipment <br />changes? <br />Is there at all times at least one <br />employee at the facility, or close by and <br />on call, designated as EC, who is <br />thoroughly familiar with all facility <br />operations, wastes, records, layout, <br />and emergency procedures, who has <br />authority to commit the resources to <br />carry out the contingency plan? <br />(67144/265.55] <br />If an emergency has occurred at this <br />facility, did the EC comply with all <br />required emergency procedures? <br />[67145/265.56] — <br />Page 14 <br />