ExxonMobil Oil Corporatio* - 3 - • 25 November 2008 <br /> 75 E. Alpine Ave., Stockton <br /> • As indicated above, installation of wells MW-8 and DW-4 may postponed until offsite access <br /> is given; however, when these wells are installed, I recommend that they be relocated closer <br /> to CPT-4, unless additional technical documentation is provided to show the 75'-80' bgs <br /> sand unit reported at CPT-4 actually extends to CPT-5. <br /> • The Well Installation Report for DW-1 through DW-3(and if offsite access is granted, offsite <br /> wells DW-4 and MW-8) is now due 31 March 2009, per an ETIC email request for an <br /> extension received 18 November 2008. All new wells will be monitored quarterly for all <br /> constituents in the current monitoring program. The Well Installation Report shall provide a <br /> recommendation to include active remediation of contamination at your site. <br /> • If additional information is determined necessary to evaluate the feasibility of a remedial <br /> alternative, then a Workplan for a bench scale test (BST) or a pilot study (PS) is also due <br /> 31 March 2009 and may be combined with the Well Installation Report. <br /> • A Feasibility Study (FS), due 31 May 2009, shall include all data collected to date, including <br /> the new deep wells, and shall evaluate at least three active remedial technologies for <br /> probability of technical success and cost effectiveness. If a BST/PS is determined as <br /> necessary to provide data for conducting the FS, then the FS is due 45 days after <br /> completion of fieldwork approved under the BST/FS workplan. <br /> • Future fourth quarter reports shall evaluate the current monitoring program and provide a <br /> recommendation for reductions in monitoring frequencies and analyses. Those <br /> recommendations must include technical justification for the changes, and will be reviewed <br /> and approved in writing by Regional Board staff before any changes to the monitoring <br /> program are implemented. <br /> Please procure all necessary permits and easements for the wells installation, and give the San <br /> Joaquin County Environment Health Department and myself at least three working days notice prior to <br /> start of work and for any changes to the schedule. If you have any questions, you may contact me at <br /> (916) 464-4615, or I can be reached by email at jbarton@waterboards.ca.gov. <br /> JnAM <br /> ESLL. BARTON, P.G. <br /> gineering Geologist <br /> cc: Ms. Carmen Harms, SWRCB, UST Cleanup Fund, OSCA Account, Sacramento <br /> Ms. Margaret Lagorio, San Joaquin County Environmental Health Department, <br /> 600 East Main Street, Stockton 95202 <br /> Mr. Duane and Ms. Wendy Berdt, Guido Segarini Trust, PO Box 1810, Aptos 95001 <br /> Ms. Theresa Marler, 14245 Lora Drive, #16, Los Gatos, CA 95030 <br /> Ms, Kama Herringfeld, Herum, Crabtree Brown, 2291 W. March Lane, Ste. 100, Stockton 95207 <br /> Mr. Kelly Reilly, 7808 Kelley Drive, Ste. F, Stockton 95207 <br /> Mr. Erik Appel, ETIC Engineering, 2285 Morella Avenue, Pleasant Hill 94523 <br />