My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1820
>
2200 - Hazardous Waste Program
>
PR0540263
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:01:48 PM
Creation date
11/1/2018 8:36:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540263
PE
2220
FACILITY_ID
FA0019717
FACILITY_NAME
Boretech Resources Recovery Engineering LLC
STREET_NUMBER
1820
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
000-050-868-9
CURRENT_STATUS
02
SITE_LOCATION
1820 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1820\PR0540263\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
10/13/2016 9:43:42 PM
QuestysRecordID
3233882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
���rrG iNr <br /> ' PO Box 1007 PROPOSAL <br /> * cnstrucfioned a Woodb dge, CA 95R E C0 <br /> inc. P 209.464.3352 <br /> /4'/NG <br /> � F 209.368.0600 MAY Q 3 2017 <br /> . License Number 632667 <br /> ANG QOP4\ <br /> CNM£h i AL FF—AJ-TH. <br /> 07/14/15 PERfAlTrSER�n0,E9 Quote#S15-100 <br /> Zhejiang Boretech Co., LTD <br /> 1820 Industrial Way <br /> Stockton,CA <br /> Attention: Phil <br /> RE: Epoxy containment <br /> We are pleased to quote installing approximately 360 Lineal feet of Epoxy coating 12"wide and up the curb as <br /> follows: <br /> Prop up existing piping and cut some existing piping to get out of the way. <br /> Must be dried for a couple of days <br /> Diamond grind the floor and curb <br /> Install the Dura-flex elastocoat membrane and polycrete HF urethane Cement 1/8"thick. <br /> Reinstall pipes <br /> EXCLUSIONS <br /> 1. Design <br /> 2. All testing <br /> 3. Moving of tanks <br /> 4. Dewatering <br /> 5. Permits or fees <br /> 6. Temp toilet <br /> Total Price: $ 15,215.00 <br /> Price is good for 30 days. <br /> By signing this proposal you agree to pay for work within 30 days of completion <br /> Owner Date <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.