Laserfiche WebLink
DVIU' M <br />CH <br />2.5 INSTALLING <br />7'tr�'-Ai� ;Fi g= it A)IIE`IA 4 4A 9-11 � r�r" M-mq,pfr3FiJ <br />Machines provided by Boretech should be installed by eligibility licensed technician, should <br />prepare and follow the requirements provided in installation drawing. <br />2c VIC n,J� 611a, J., ful <br />o <br />Before installation all installing personal should be educated in both installing technics and <br />safety, to be familiar with standard and criterion for installing production line. <br />RGIZTffl <br />Preparation for installation, foundation should be eligible, obstacle should be removed, and <br />pathway should be smooth. Electricity for equipment should be guaranteed. <br />Main installation equipment contains crane, forklift, man powered vehicle, and chain. Model <br />of the crane should be prepared according to the height of the facility and weight of the <br />equipment. <br />t�OTr rlf, VFVP'bi-11 immix*nl a p7. J fp7�K o <br />When Installation of the production line, should notice the horizontal centerline, longitudinal <br />and horizontal direction of the machine. <br />Construction surveying and measuring instrument:chalk line,line hammer,steel tap,steel <br />ruler,gradienter,crowbar,hammer. <br />--M, ryl,? 7 911, k J �JJ 1J <br />Device attachment & replacement tool:monkey wrench,screwdriver,socket head <br />wrench,percussion drill ing,abrasive wheel cutting machine,welding and cutting <br />equipment,diehead threading machine,pipe wrench,jump ring pincers. <br />12 <br />