My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1820
>
2200 - Hazardous Waste Program
>
PR0540263
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:01:48 PM
Creation date
11/1/2018 8:36:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540263
PE
2220
FACILITY_ID
FA0019717
FACILITY_NAME
Boretech Resources Recovery Engineering LLC
STREET_NUMBER
1820
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
000-050-868-9
CURRENT_STATUS
02
SITE_LOCATION
1820 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1820\PR0540263\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
10/13/2016 9:43:42 PM
QuestysRecordID
3233882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DVIU' M <br />CH <br />2.5 INSTALLING <br />7'tr�'-Ai� ;Fi g= it A)IIE`IA 4 4A 9-11 � r�r" M-mq,pfr3FiJ <br />Machines provided by Boretech should be installed by eligibility licensed technician, should <br />prepare and follow the requirements provided in installation drawing. <br />2c VIC n,J� 611a, J., ful <br />o <br />Before installation all installing personal should be educated in both installing technics and <br />safety, to be familiar with standard and criterion for installing production line. <br />RGIZTffl <br />Preparation for installation, foundation should be eligible, obstacle should be removed, and <br />pathway should be smooth. Electricity for equipment should be guaranteed. <br />Main installation equipment contains crane, forklift, man powered vehicle, and chain. Model <br />of the crane should be prepared according to the height of the facility and weight of the <br />equipment. <br />t�OTr rlf, VFVP'bi-11 immix*nl a p7. J fp7�K o <br />When Installation of the production line, should notice the horizontal centerline, longitudinal <br />and horizontal direction of the machine. <br />Construction surveying and measuring instrument:chalk line,line hammer,steel tap,steel <br />ruler,gradienter,crowbar,hammer. <br />--M, ryl,? 7 911, k J �JJ 1J <br />Device attachment & replacement tool:monkey wrench,screwdriver,socket head <br />wrench,percussion drill ing,abrasive wheel cutting machine,welding and cutting <br />equipment,diehead threading machine,pipe wrench,jump ring pincers. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.