Laserfiche WebLink
BOREFE <br />E <br />CH <br />-6F-i4Lzi049 Nli ILitITTMT-41-=: <br />ix 41gAW;4 .ter: A ; <br />t 4i*—C�iVA' � EaPT JL L Q <br />Prior to commissioning, in addition to compliance of installation with technical requirements, <br />inspection shall be carried out on the following items: <br />Washing machine, vibrating screen, whether in level state,whether the base is fixed, whether <br />the various connection parts connected fastening is reliable, safe,should regular maintenance, <br />must not loose; <br />The operating components shall be regularly lubricated to keep the lubricating oil in reduction <br />box above the minimum height of oil pointer; <br />Check whether the fine filters of the vibrating screen and wheel screening machine are spread <br />flat; <br />As for the magnetic turning column level gauge, if the turning colors of the magnetic turning <br />column are not consistent before the use, it is necessary to use magnetic steel for rectification <br />so as to make the column display red when below zero position and white when above zero <br />position. When putting the gauge into use, first, open the valve of the upper liquid introducing <br />tube, and then slowly open the lower liquid introducing tube to let the liquid medium flow in <br />the main duct in a stable way to avoid turning failure or disorder of the magnetic turning column <br />due to the rapid rise of the liquid medium with the float. In case of encountering this <br />phenomenon, use magnetic steel to rectify the column once again. <br />The electrical signal and control device as well as their connection shall be checked to ensure <br />normal service; <br />Start the motor and observe whether the rotation direction of the washing machine, pumps, <br />vibrating screen and wheel screening machine is correct; <br />During the trial run, the following work should be conducted: <br />Check whether there is any abnormal noise during the operation of the equipment; <br />33 <br />