Laserfiche WebLink
DOREIri <br />CH <br />2 n4/ Shell 4 aff / Rod 6 1 aA / Nozzle <br />13.2.2cz INS TALLATIONPRECAUTIONS <br />ffigFII:J *9c-i�Llz*A ���Q�`J%�'�`X��1_Ija&&N*4%a_ffT; <br />IM <br />MVD14. <br />Prior to installation, the installation techniques and drawing requirements shall be understood, <br />and the equipment shall be installed as the location and dimension specified in the drawing; <br />The equipment is supplied and installed as a complete machine, for which no on-site <br />disassembly or assembly is required. In installation, no strike to the motor reduction box and <br />screw is allowed during elevation and handling to prevent deformation and damage. <br />Keep the screw support vertical and stable, closely join the lug to the support and use a lock <br />ring to fix them firmly; <br />As for the installation at scene feed inlet and outlet, keep the flange supporting surface of the <br />inlet and outlet parallel to the axis of the screw conveyor body; <br />Close join the connecting flanges and add a waterproof cushion to ensure they are reliable <br />sealing without any gap for the avoidance of water leakage; <br />Fasten the connecting bolts symmetrically and evenly and screw all connecting screws tightly; <br />Check whether there is enough lubricating oil in the reduction box and bearing upon completion <br />of the installation. <br />40 <br />