My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1820
>
2200 - Hazardous Waste Program
>
PR0540263
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:01:48 PM
Creation date
11/1/2018 8:36:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540263
PE
2220
FACILITY_ID
FA0019717
FACILITY_NAME
Boretech Resources Recovery Engineering LLC
STREET_NUMBER
1820
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
000-050-868-9
CURRENT_STATUS
02
SITE_LOCATION
1820 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1820\PR0540263\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
10/13/2016 9:43:42 PM
QuestysRecordID
3233882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BORHIri <br />CH <br />sealed bottle. The inspection type and size of metals may be adjusted on the basis of the <br />constitution and quality objective of materials. <br />14.2 INSTALLATION PRECAUTIONS <br />�Ak ��J r)Y#A_tILM2c Vxlk*fPM`NP rt( MiNPfr%rn, IftWaR-1� ; <br />i;4,; <br />Alki 1AR ?JAn-W S _FrPIf'1—fit PVC # <br />M,f ��IrJAN' 9; <br />MitA�ito <br />Before installation,should be familiar with mechanical drawings and/or installation <br />technology requirements, installation should be according to the location and size <br />shown as the drawings; <br />Perform all lifting and handling procedures are strictly forbidden to hit motor reducer, <br />in order to avoid deformation, damage to equipment; <br />Lifting belt conveyor, should have protective measures, to prevent the rope abrasion <br />equipment surface paint, rope load to smooth, prevent the sideslip, when hoist <br />equipment, personnel are strictly prohibited to enter below the machine, lest produce <br />an accident. <br />Platform on the conveyor belt with subsection (4) manufacturing. Under the condition <br />of equipped with metal detectors,there is a PVC material,for installing the metal <br />detectors; <br />For the convenience of transport, it has been disassembled when loading, when <br />assembling conveyor belt at the scene, both ends of it should be parallel, connected with <br />bolt, fastening bolts evenly as symmetrical force; <br />46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.