Laserfiche WebLink
BORMri <br />CH <br />During the installation, carry out a thorough inspection to the various spare parts, checking <br />whether the machine body is complete, whether the parts connect closely and whether rotors <br />are flexible; <br />The flange connections of feed inlet and outlet should be compact without any gap; <br />Carefully check the machine shell. There should be no tools or sundries dropped or left in the <br />shell; <br />Electrical connection shall be conducted in accordance with the drawing of electric cabinet, <br />and the power output terminal of the electric cabinet and the connecting terminal of the <br />equipment drive motor shall be connected in line with the wire marking. <br />15.3 iv--iia;�rDA OPERATION PRECAUTIONS <br />i aR( J> Q 'rS7 cam, MP, T�M; <br />AM 15.4 N'A'-o t1E m T7'r 75'� <br />F, A 16� kTti: �VJY 4 600 ^JI1�4 <br />Prior to commissioning, in addition to compliance of installation with technical requirements, <br />inspection shall be carried out on the following items: <br />The fasteners between connecting pieces shall be checked to ensure secure and safe connection. <br />They shall be subject to regular maintenance to prevent looseness; <br />Slowly rotate the rotor in the label scrapping machine to check whether its rotation is normal <br />without collision; <br />Check whether there is enough the lubricating oil in the bearings at both ends of the shaft; <br />51 <br />