Laserfiche WebLink
BORETri <br />CH <br />A 16-1 Table 16-1 <br />1f' <br />10 / Drum body <br />5 <br />A)�/ Pedestal <br />2,T <br />xxC/ Label screen frame <br />6 <br />gFn/ Outer casing <br />3 <br />RAI/Fan <br />7 <br />Bottle trolley <br />4 <br />*MR -M/ Transmission device <br />16.2 INSTALLATION PRECAUTIONS <br />�c- V, Rvk-#%rVtn, , 7*l-A-AMAJE00n, �E 1A W, AMf9TI-V4tT*-T, MlA44, r�S <br />M�3�ETot �z-., aJWAK-VYVL M 'jH^- �Y'Pt7 J=J9,19, �& A; <br />WA%,7j)W c (IM 14.2 t �'�#Il> ; <br />%T'�Wgrol1:; <br />R@R-kRto <br />Prior to installation, the installation techniques and drawing requirements shall be understood, <br />and the equipment shall be installed as the location and dimension specified in the drawing; <br />Safety measures should be adopted in time of suspending to prevent the surface of equipments <br />from being bruised or bumped by lifting rope etc.. No strike to the motor reducing gear and <br />pump is allowed during elevation and handling to prevent deformation and damage. <br />While installing the label blowing machine, first, place its pedestal to the correct mounting <br />position and ensure it to be in horizontal level, and then hoist the drum on the pedestal. Note <br />that the guide rail must closely join with the four guide wheels; <br />Installation of the screw conveyor (See 14.2 Screw Conveyor); <br />Electrical connection shall be conducted in accordance with the drawing of electric cabinet, <br />and the power output terminal of the electric cabinet and the connecting terminal of the <br />equipment drive motor shall be connected in line with the wire marking. <br />16.3 OPERATION PRECAUTIONS <br />54 <br />