Laserfiche WebLink
BORM1'i <br />Installed base should have a thickness of not less than 300 concrete recommendations <br />dehydration machine ground plane with a thickness of 10 — 20mm rubber vibration isolation, <br />we recommend using the GB the M12X150 anchor bolts fixed <br />Dewatering machine is the machine supplier, overall installation in the field do not have to <br />re- solution parts and assembly, lifting and handling operations performed during installation <br />when the non- impact machines, in order to avoid equipment deformed or damaged <br />Installation should be noted that the retention flip , motor maintenance , belt replacement <br />space <br />Water, so the machine can be equipped with side outlet pipe factory , the other side of the <br />blind flange , outlet pipe to drain by the user <br />Installed the machine power cord, commonly used three-phase four -wire , including first-line <br />for another three -wire grounding wire power cord <br />19.3IJ�RIRJ�STYLE &MAIN PARAMETER <br />tJ� Style <br />TS600 <br />TS800 <br />*a <br />77`1 (t/h) <br />1.5 <br />2.7 <br />1 OX I O,PET M, 1 -/PET Flakes <br />A. *14_1(%) <br />2.5 <br />2.5 <br />rjJ-4-(kw) <br />18.5 <br />55 <br />It (KG) <br />1000 <br />2500 <br />*RSRt Siza <br />2520X1767XI647 <br />2479X1924X2029 <br />19.4 7Lja OPERATION PRECAUTIONS <br />76 <br />