My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1820
>
2200 - Hazardous Waste Program
>
PR0540263
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:01:48 PM
Creation date
11/1/2018 8:36:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540263
PE
2220
FACILITY_ID
FA0019717
FACILITY_NAME
Boretech Resources Recovery Engineering LLC
STREET_NUMBER
1820
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
000-050-868-9
CURRENT_STATUS
02
SITE_LOCATION
1820 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1820\PR0540263\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
10/13/2016 9:43:42 PM
QuestysRecordID
3233882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The operators shall not put the hands into the parts operating at a high-speed to avoid <br />accident; <br />Feeding shall follow normal operation after startup to avoid blockage of dryer; <br />Open the observation opening of dryer and wash the powder clung on the mesh inside the <br />dryer when a shift is over to avoid affected drying effect and increased load of the dryer by <br />mesh blockage. <br />The general power shal I be cut off during equipment cleaning to ensure safety. <br />19.5 X1 (a7 W—, COMMON QUESTION <br />19.5.1 /5,J Q: BLOCKAGE CAUSED BY <br />BLOCKAGE OF THE MAIN REASONS : <br />a '�1 43 RIVAL; b A;Rd*, 399E)J; c pi 1`i ` d <br />a .material residual excessive ; b. belt too loose, advancing weakness ; c. blade wound ; bulk <br />materials stuck d. discharge channel ; e .discharged material is not timely remove the cause to <br />the machine accumulation. <br />)Ci1E15j#[W&1)Aj4- <br />No matter what the situation is caused by congestion, should be the first stop to feed, <br />disconnect the power, then turn out at the outlet of the discharge window discharge, should <br />finish unloading the material to find causes for congestion and take appropriate action before <br />turning on power. <br />19.5.2DEHYDRATION <br />THE LOW CAUSE DEHYDRATION LOW MAINLY DUE TO : <br />a Af4T- `%J%J; b AOAAJi ; c A14A*; d A�=l**tA; e tf4R�iit; f � <br />mig ; <br />a feed uneven ; b feed excessive ; the c belt too loose ; d feed moisture content is too high ; <br />the a material size is too large ; f to clogging <br />78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.