My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1820
>
2200 - Hazardous Waste Program
>
PR0540263
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:01:48 PM
Creation date
11/1/2018 8:36:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540263
PE
2220
FACILITY_ID
FA0019717
FACILITY_NAME
Boretech Resources Recovery Engineering LLC
STREET_NUMBER
1820
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
000-050-868-9
CURRENT_STATUS
02
SITE_LOCATION
1820 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1820\PR0540263\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
10/13/2016 9:43:42 PM
QuestysRecordID
3233882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BORETE <br />CH <br />screw conveyor from the hot -washing discharging outlet to the feeding inlet at the lower part <br />of the friction machine, and then is conveyed by feeding screw stem in uniform to the friction <br />machine, and after through friction induced by high-speed rotation of the rotor vane goes <br />from the discharging outlet at the upper part to the dryer. <br />Friction machine blade is expendable, under normal circumstances, after running 600 hours, <br />check the blade wear, and check whether the fastener is loose, when the blade wear to blade <br />fixed link, to replace the blade, and do dynamic balance test. <br />This work section is designed to make up for the deficiency of previous entire -bottle -washing <br />(especially inside -bottle -washing) technology and further remove impurities like viscose <br />clung on the surface of PET bottle with friction machine. The agent liquid used in this work <br />section is in a water circulation system and the flowchart is shown as the following Fig. 20-3: <br />84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.