Laserfiche WebLink
BORETE <br />E <br />CH <br />Prior to installation, the equipment installation techniques and drawing requirements shall be <br />understood, and the equipment shall be installed as the location and dimension specified in <br />the drawing; <br />No strike to the equipment shall be allowed during elevation and handling in installation, to <br />prevent equipment deformation and damage; <br />The flanges connected to the feeding inlet and the discharging outlet shall be closely joined <br />and rubber washers shall be fitted between flanges to prevent feed leak. <br />The flanges connected to the air duct and the cyclone dust collector shall be closely joined <br />without clearance and rubber washers shall be fitted between flanges to prevent air and feed <br />leak. <br />Electrical wiring shall be conducted as the drawing of electric cabinet, and the power output <br />terminal of the electric cabinet and the connecting terminal of the equipment drive motor shall <br />be connected in line with the wire marking. <br />* 22-1 Fig.22-1 <br />1 <br />1#4 F]/ Feeding inlet <br />2 <br />9'C''I`MA/ Dust -absorption fan <br />3 <br />I-tx, f / Air duct <br />4 <br />W-�AtgA)/ Dedusting cyclone dust collector <br />5 <br />c,' q/ Powder outlet <br />6 <br />if', FI / Flake feed outlet <br />7 <br />#Lk"/ Equipment rack <br />8 <br />AAW Main machine <br />9 <br />Vtt �-, 14#U Revolving plow reclaimer <br />93 <br />