My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1820
>
2200 - Hazardous Waste Program
>
PR0540263
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:01:48 PM
Creation date
11/1/2018 8:36:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540263
PE
2220
FACILITY_ID
FA0019717
FACILITY_NAME
Boretech Resources Recovery Engineering LLC
STREET_NUMBER
1820
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
000-050-868-9
CURRENT_STATUS
02
SITE_LOCATION
1820 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1820\PR0540263\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
10/13/2016 9:43:42 PM
QuestysRecordID
3233882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BORETE <br />E <br />CH <br />Prior to installation, the equipment installation techniques and drawing requirements shall be <br />understood, and the equipment shall be installed as the location and dimension specified in <br />the drawing; <br />No strike to the equipment shall be allowed during elevation and handling in installation, to <br />prevent equipment deformation and damage; <br />The flanges connected to the feeding inlet and the discharging outlet shall be closely joined <br />and rubber washers shall be fitted between flanges to prevent feed leak. <br />The flanges connected to the air duct and the cyclone dust collector shall be closely joined <br />without clearance and rubber washers shall be fitted between flanges to prevent air and feed <br />leak. <br />Electrical wiring shall be conducted as the drawing of electric cabinet, and the power output <br />terminal of the electric cabinet and the connecting terminal of the equipment drive motor shall <br />be connected in line with the wire marking. <br />* 22-1 Fig.22-1 <br />1 <br />1#4 F]/ Feeding inlet <br />2 <br />9'C''I`MA/ Dust -absorption fan <br />3 <br />I-tx, f / Air duct <br />4 <br />W-�AtgA)/ Dedusting cyclone dust collector <br />5 <br />c,' q/ Powder outlet <br />6 <br />if', FI / Flake feed outlet <br />7 <br />#Lk"/ Equipment rack <br />8 <br />AAW Main machine <br />9 <br />Vtt �-, 14#U Revolving plow reclaimer <br />93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.