My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1820
>
2200 - Hazardous Waste Program
>
PR0540263
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:01:48 PM
Creation date
11/1/2018 8:36:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540263
PE
2220
FACILITY_ID
FA0019717
FACILITY_NAME
Boretech Resources Recovery Engineering LLC
STREET_NUMBER
1820
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
000-050-868-9
CURRENT_STATUS
02
SITE_LOCATION
1820 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1820\PR0540263\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
10/13/2016 9:43:42 PM
QuestysRecordID
3233882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BORE ri <br />CH <br />tobacco like as .light bulbs packaged loose material.In order to maximize complex <br />transport or storage, users can customize the package specifications, size by himself so <br />the transport costs is reduced. <br />B, AP/�y, : CHARACTERISTIC <br />b. 3K ffl rAQ, PLC A rPr:�_$1J, _PJ 4��Ji).9 V �U-tnMr$IJ. 2z�it IT�tit 1-= ter <br />WE2z4o <br />d. I�X07*ffi7x-_�, 9-MrI=[ftj3f1'7Y ,X44, f-1q_Pf M ix�A AMgk <br />AI +� _P - <br />a, Hydraulic transmission, with independent power sector and electrical control systems. <br />b. It can achieve adjustment manual and semi-automatic control by using buttons, PLC <br />centralized control. in order to make the operation more safer ,so we take safety <br />interlocks. <br />c. It take Independent the bag mouth and automatic device reduce labor intensity. <br />d. By according to customer needs, it take a single door type, two -door, three door <br />style, four -post, meanwhile additional residue recovery tank, so it is clean. <br />28.1.3 M: (A W—) CONSTRUCTION (FIG1 <br />103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.