My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1820
>
2200 - Hazardous Waste Program
>
PR0540263
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:01:48 PM
Creation date
11/1/2018 8:36:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540263
PE
2220
FACILITY_ID
FA0019717
FACILITY_NAME
Boretech Resources Recovery Engineering LLC
STREET_NUMBER
1820
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
000-050-868-9
CURRENT_STATUS
02
SITE_LOCATION
1820 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1820\PR0540263\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
10/13/2016 9:43:42 PM
QuestysRecordID
3233882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOREIE <br />WT <br />CH <br />28.1.6 � INSTALLATION <br />17If M, -5 1'tb_MZ 5F V 'MfR4-i-ii`7*A 170KN/ n, F±)7, �7 <br />i17� i`r�'' 1l nfx 500MM, 9,kA)i�ATx 7A-_P-Af, tJ <br />a, Installation: It is easy to install the baler which is integration machine. However, <br />it has limits of installation environment and ground. Floors should be smooth and <br />hard enough to bear at least 170 KN/sqm pressure. We recommend you to use <br />anchor bolts to position baler in view of safety and reliability if the baler has a fixed <br />position restricting the movement of baler in long-term time. The height of <br />installation space should be at least higher by 500 mm than the height of machine. <br />The ambient should be ventilated and well -lit. It must have spare space in order to <br />position machine body and hydraulic system and meet work demand of operation, <br />packaging and storage.(The space size is depended on the actual situation of <br />operating environment.) <br />The machine which is being installed can move by forkliftor crane. <br />* fA.: ar$at, TVTO�JAIIRAI <br />Remark: Please don't touch the hydro -cylinder and oil pipe during hiking up. <br />106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.