My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1820
>
2200 - Hazardous Waste Program
>
PR0540263
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:01:48 PM
Creation date
11/1/2018 8:36:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540263
PE
2220
FACILITY_ID
FA0019717
FACILITY_NAME
Boretech Resources Recovery Engineering LLC
STREET_NUMBER
1820
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
000-050-868-9
CURRENT_STATUS
02
SITE_LOCATION
1820 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1820\PR0540263\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
10/13/2016 9:43:42 PM
QuestysRecordID
3233882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BORMri <br />CH <br />b. Get the power, press the button of the motor, check and adjust rotated direction of the <br />motor, from the right direction of the motor, the rotated direction is clockwise. <br />c. View and listen to the sound of the motor and the pump running, if it is abnormal ,you <br />should immediately stop power supply, then check the fault. <br />d. If the machine is used with thetransport supports (such as a stick, some models have) <br />then the rotary selector switch to "manual" position, press the "return" switch to make the <br />tank up, then remove the transport added supports. <br />e. First unload test, the rotary selector switch to "manual" position, press and hold the <br />button pressed the slider up and down foot.3-5 times in order to drain the air in the system, then <br />turn the selector switch to the "semi-automatic" file, click the button pressed within a <br />predetermined range limit switch upper and lower motor several times until the slider uniform <br />rise or fall. Normal use, the pressure can be adjusted to 11-15Mpa. (Pressure testing method is <br />described in Chapter). Required before the machine working so thatthe machine in the load - <br />load operation for at least 15 minutes. <br />f. load test, check all fittings for leaks and sealing parts, carefully check the accuracy of <br />the host. <br />g. trial after the absence of any situation in which the trial ended, can be delivered. <br />28.1.8fE&W: BUTTON DESCRIPTION <br />O 1POWERI BACK <br />iff7�/t /- IR <br />OPEN Self auto/ ack/manual PRESS <br />STOP <br />
The URL can be used to link to this page
Your browser does not support the video tag.