Laserfiche WebLink
DVRL' M <br />CH <br />tri V rP,]) fR-T(*fP%M!200 <br />A*)J OKAffi, M_LLJPJ4, L_Ff4QJ;K & , EQn,trt:diE9z� ; <br />444V-i,A1#TtJ(, <br />Pill -IMMMM, Pp <br />Considering the practical production conditions, if you manufacture bottles with labels, you <br />may choose to let the conveyor belt on the label scrapping machine to rotate forwardly so that <br />bottles can directly be fed into the label scrapping machine for treatment and then delivered by <br />the discharge screw to the label blowing process; if you manufacture bottles with no trademarks <br />or only a few trademarks, you may choose to let the conveyor belt on the label scrapping <br />machine to rotate reversely so that the bottles with no trademark will not be fed into the label <br />scrapping machine but be directly sent down to discharge screw via the chute and then be <br />delivered to the label blowing process, while those bottles with trademarks will be sorted out <br />by workers, threw into the chute and delivered by the auxiliary conveyor belt under the platform <br />into the label scrapping machine for label scrapping treatment. <br />During labor sorting, attention should be paid to sort out large -size bottles (whose length and <br />width are more than or equal to 400mm) to avoid them enter the discharge hopper, or otherwise, <br />the feed opening is vulnerable to blockage and influences the normal operation of the <br />production line. <br />Meanwhile, for the purpose of better protecting the label scrapping machine's friction blade, <br />friction alloy head bolt and extending their service life, it is also necessary to sort out rocks, <br />gravels and other inorganic solid matters during labor sorting to prevent these solid matters <br />from entering the label scrapping machine that is operating at a high speed to damage the <br />friction blade and bolt and shorten their service cycle and life. <br />31.4 AJ64,AL LABEL SCRAPPING UNIT <br />31.4.1 ' 1 F--Yk,�YOPERATION PROCEDURES AND KEY POINTS <br />fF#ILWT FlcY 7 J T IL�i n�1i , 1 36AMI J#T, <br />+4; T 1tt �1 � 1 �i �, 1#%T J1�7J � 1���� T � J#%T#Jlo <br />The discharge conveyer belt of label scrapping machine should be started at first place, and <br />then label scrapping machine. Start feeding after it operates normally. As for stopping, <br />137 <br />