My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1820
>
2200 - Hazardous Waste Program
>
PR0540263
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:01:48 PM
Creation date
11/1/2018 8:36:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540263
PE
2220
FACILITY_ID
FA0019717
FACILITY_NAME
Boretech Resources Recovery Engineering LLC
STREET_NUMBER
1820
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
000-050-868-9
CURRENT_STATUS
02
SITE_LOCATION
1820 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1820\PR0540263\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
10/13/2016 9:43:42 PM
QuestysRecordID
3233882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERS Consolidated Emergency Response / Contingency Plan — Page 4 of 4 <br />Rev. 06/27/11 <br />H. EARTHQUAKE VULNERABILM , <br />Identify areas of the facility that are vulnerable to hazardous materials releases / spills due to earthquake -related motion. These areas require immediate isolation and <br />inspection. <br />VULNERABLE AREAS: (Check all that apply) M. <br />_ LOCATIONALe.g,_,_shoQ, outdoorsbad�foreasio <br />® 1. HAZARDOUS MATERIALS/ WASTE STORAGE AREA <br />Warehouse and waste water Treatment Arae. <br />❑ 2. PROCESS LINF,S / PIPING <br />❑ 3. LABORATORY <br />H4. <br />❑ 4. WASTE TREATMENT AREA <br />Hs. <br />Identify mechanical systems vulnerable to releases / spills due toearthquake-related motion. Theses stems require immediate isolation and inspection. <br />VULNERABLE SYSTEMS: (Check all that apply) Ha I LOCATIONS---------------_-----._-._-....-.------_----------__..___ <br />❑ 1. SHELVES, CABINETS AND RACKS HJ. <br />---- - --'----.--� T- <br />® 2. TANKS (EMERGENCY SHUTOFF) Outdoo e(Wasrn Water Tmw.)t> Hs. <br />® 3. PORTABLE GAS CYLINDERS warehouse H9. <br />❑ 4. EMERGENCY SHU COFF AND/OR UTILITY VALVES we, <br />❑ 5. SPRINKLER SYSTEMS Ht 1. <br />❑ 6. STATIONARY PRESSURIZED CONTAINERS (e.g., Propane dispensing tank) H12. <br />. L'E1W. tt�.7 Fi r i 14L•7llY, tl� CY <br />Explauatlon of Requirement: Employee training is required for all employees handling hazardous materials and hazardous wastes in day-to-day or clean-up operations <br />including volunteers and/or contractors. Training must be: <br />• Provided within 6 months for new hires; <br />• Amended as necessary prior to change in process or work assignment; <br />• Given upon modification to the Emergency Response/ Contingency Plan, and updatedirefreshed annually for all employees. <br />Required content includes all of the following: <br />• Material Safety Data Sheets; • Communication and alarm systems; <br />• Hazard communication related to health and safety, • Personal protective equipment; <br />• Methods for safe handling of hazardous substances; • Use of emergency response equipment (e.g. Fire extinguishers, respirators, <br />• Fire hazards of materials / processes; etc.); <br />• Conditions likely to worsen emergencies; • Decontamination procedures; <br />• Coordination of emergency response; • Evacuation procedures; <br />• Notification procedures; • Control and containment procedures; <br />• Applicable laws and regulations; • UST monitoring system equipment and procedures (if applicable). <br />INDICATE HOW EMPLOYEE TRAINING PROGRAM IS ADMINISTERED (Check all that apply) [t. <br />® 1. FORMAL CLASSROOM; ❑X 2. VIDEOS; ® 3. SAFETY / TAILGATE MEETINGS; <br />® 4. STUDY GUIDES / MANUALS (Specify): Handout Mererlals <br />❑ 5. OTHER (Specify): <br />❑ 6. NOT APPLICABLE BECAUSE FACILITY HAS NO EMPLOYEES <br />Large Quantity Generator (LQG) Training Records: Large quantity hazardous waste geoen tors (i.e., who generate more than 270 gallons/ 1,000 kilograms of <br />hazardous waste per mouth) must retain written documentation of employee hazardous waste management training sessions which includes: <br />• A written outlinelagenda of the type and amount of-both-introductory-and-continuing-training-that-vilLbe-given_to_persons filling each job position having <br />responsibility for the management of hazardous waste (e.g., labeling, manifesting, compliance with accumulation time limits, etc.). <br />• The name, job title, acid date of training for each hazardous waste management training session given to an employee filling such a job position; and <br />• A written job description for each of the above job positions that describes job duties and the skills, education, or other qualifications required of personnel assigned <br />to the position. <br />• Current employee training records must be retained until closure of the facility. <br />• Former employee training records must be retained at least three years after termination of employmenL <br />..::....::.... J. LIST 0FATr'ACP�'s :...::. -=: '::`.:. ... , ;. <br />(Check one of the following) it. <br />® 1. NO ATTACHMENTS ARE REQUIRED; or <br />❑ 2. THE FOLLOWING DOCUMENTS ARE ATTACHED: ]Z <br />Certlftcatbs: Based on my inquiry of those Individuals responsible for obtaining the infouradon, I certify under penalty of law that I have personally examined and <br />am familiar with the information submitted believe the information is true, accurate, and complete, and that a copy is available on site. <br />SIGNATURE OF OWNER/OPERATOR <br />DATE SIGNED Kr. <br />3131 /20 17 <br />NAME OF SIGNER (print) K2• <br />TITLE OF SIGNER K3• <br />Paul Ou <br />Vice President <br />
The URL can be used to link to this page
Your browser does not support the video tag.