My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1820
>
2200 - Hazardous Waste Program
>
PR0540263
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:01:48 PM
Creation date
11/1/2018 8:36:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540263
PE
2220
FACILITY_ID
FA0019717
FACILITY_NAME
Boretech Resources Recovery Engineering LLC
STREET_NUMBER
1820
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
000-050-868-9
CURRENT_STATUS
02
SITE_LOCATION
1820 INDUSTRIAL WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1820\PR0540263\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
10/13/2016 9:43:42 PM
QuestysRecordID
3233882
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> �{ A <br /> ENMRONME.iNaTAt V.1Ekt7�i <br /> Hazardous Waste Training Questionnaire ' <br /> Note: This quiz is intended to accompany the Self-Study Hazardous Waste Generator Training 1 <br /> video and could be used to satisfy the annual employee training documentation requirement, <br /> I <br /> Employee Name: Date:d <br /> C 1. To be safe, when is the best time to mark the accumulation start date on a container or <br /> tank of waste? <br /> a. When the container or tank is full <br /> b. During the inspection when the inspector says to <br /> c. When the first drop is added to the tank or container <br /> d. Let the hauler do it j <br /> i3 2. If you area Small Quantity Generator(SQG);meaning you generate 100-1,000 kg(1/2 to <br /> 5 x 55 gallon drums)of waste per month,how long can you store your waste onsite? i <br /> a. 90 days <br /> b, 180 days <br /> c, One year <br /> d. No storage time limit <br /> —9 3. Rules for storage times are based on how much waste you generate,in kilograms. <br /> Approximately how much is 1000 kilograms? <br /> a. 5 tons <br /> b. Five 55-gallon drums <br /> c, 55 gallons <br /> d. 5000 pounds <br /> 4. Which of the following information is NOT required to be on a hazardous waste label <br /> while storing it onsite? <br /> a. BPA ID Number <br /> b. "Hazardous Waste" <br /> c. Business Name and address <br /> d. Physical state of waste <br /> 5. Which of the following is NOT a requirement for container management? <br /> �] a. Closed except when adding or removing waste <br /> -b. Designed specifically for hazardous waste storage <br /> c., Kept in good condition <br /> d. Labeled when holding waste <br /> t <br /> 6. Which of the following wastes may be shipped using a consolidated manifest? <br /> a. Antifreeze { <br /> b. Parts washing solutions f <br /> c. Used oil <br /> d. All of the above <br /> jj 7. How do you know what to do and/or where to send,the six different copies of a <br /> manifest? <br /> a. It's printed in the bottom comer of the manifest <br /> b. I don't need to,the transporter is responsible after signing <br />
The URL can be used to link to this page
Your browser does not support the video tag.