Laserfiche WebLink
• <br />Spill Prevention Compliance Corporation <br />Periodic Integrity Test Certificate <br />P.O. Box 1289........ Waterford, CA 95386 Telephone: (209) 969-0851 <br />Email: spccorDAhotmail.com <br />Client: Nissan -Kia of Stockton Contact Person: Ron A2uiar, Service Manager <br />Address: 3077 E. Hammer Lane Phone Number: 209-956-6500 <br />City/State/Zip; Stockton, CA 95212 Date of Test: 8-6-15 <br />Tank Information (Brand/gallonage/Fuel Stored/UL or other serial#/miscellaneous) <br />Unbranded Tank /450 gals/ Waste Coolant/ Dble Wall Poly 40CFR-264.193compliant <br />Description of Secondary Containment Integral Secondary Containment <br />Date of Test 8-6-15 Test Supervisor(s) Todd McWhorter <br />METHOD OF PERIODIC INTEGRITY TEST -Primary XX Secondary XX <br />1. Poly Outer Wall Thickness Test (in accordance with ISO 9000/9014 and/or STI SP001 (5a` <br />edition) -readings avg. 6.7 mm thickness- Suitable for continued usage <br />2. Inert Gas Blanket <br />Gas Used: Nitrogen_; CO2: ; Other (specify) <br />Air Pressure -Test Vacuum Test ; <br />Initial Reading (document psi/WC readings) Time <br />End Readings (document psi/WC readings) Time <br />Duration of Test: % drop <br />3. Sonar -Test YN (document db readings) Duration <br />4. Camera(visual) model Lorex MC81845/interstitial _ (Result: P/F) Pass <br />5. Hydro -Carbon Sensor (probe) model (Result: P/F) <br />6. Hydrology (Water Column) ( inches of water column readings) <br />Duration % Drop Results (P/F) <br />7. Other: Inspect Primary Vessel and secondary containment. AST, CRDM present, no <br />evidence of leaking product from primary vessel, system was easily accessible for <br />inspection: No evidence of leak or of any Product/AST is anchored <br />TEST RESULTS <br />1st -Stage: <br />Pass XX Fail_ (quantify) OUTER WALL THICKNESS= 6.7 mm ON SIDE AVG. <br />SUITABLE FOR CONTINUED USAGE <br />2nd -Stage: <br />Pass XX Fail_ (quantify) NO VISUAL EVIDENCE OF PRODUCT IN INTERSTICE <br />OR ANY OTHER LEAKS <br />Next Scheduled Periodic Integrity Test <br />Date of Next Scheduled Test <br />Corp Representative <br />