My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOLLY
>
4101
>
2200 - Hazardous Waste Program
>
PR0514490
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2021 1:46:03 PM
Creation date
11/1/2018 9:16:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO_PRE 2019
FileName_PostFix
PRE 2019
RECORD_ID
PR0514490
PE
2220
FACILITY_ID
FA0011012
FACILITY_NAME
PACIFIC COAST INDUSTRIES
STREET_NUMBER
4101
Direction
N
STREET_NAME
HOLLY
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21222007
CURRENT_STATUS
02
SITE_LOCATION
4101 N HOLLY DR
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HOLLY\4101\PR0514490\COMPLIANCE INFO 1999 - 2016 .PDF
QuestysFileName
COMPLIANCE INFO 1999 - 2016
QuestysRecordDate
6/27/2017 10:36:08 PM
QuestysRecordID
3471225
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Managers: <br />On 10/10/08 the Environmental Health Department visited our plant for the purpose of a <br />follow up audit to the April 2008 audit. The audit team had made several findings and <br />listed violations on 28 items some of which were duplicates at the plant 3 site during that <br />April audit. As a result of the inspection in April we were required to take corrective <br />actions to bring those items into compliance. The follow up audit on 10/10/08 looked at <br />all the items to have been corrected, and was completed satisfactorily Kasey Foley the <br />lead auditor stated that she was very pleased with our efforts. The auditors all commented <br />how impressed they were with the change in our facility since the April audit. <br />The audit team made a few suggestions for us to make further improvements at the <br />following areas. <br />1 Place a catch pan at the asphalt line under the colander rolls drive area. (Asphalt) <br />2. Place a catch pan at the mixing bucket drive mechanism. (Asphalt) <br />3. Add the hazardous property to the labels on the hazardous waste barrels. (pelt 2 ) <br />add the eye wash stations to our daily walk through check sheet (plt 2�✓ <br />We must still complete paper work and submit our return to compliance certification, in <br />order to complete the process. <br />I would like to thank all managers who were of assistance in completing these items and <br />to those of you who will be called on to maintain our current condition. <br />Thanks <br />John Daniel <br />Management Representative <br />
The URL can be used to link to this page
Your browser does not support the video tag.