Laserfiche WebLink
API 653 Out-of-Service Inspection Report <br /> for <br /> J.R. Simplot Inspection <br /> Tank No. 8 August 27-28,2008 <br /> Lathrop, CA Page 13 of 54 <br /> 4.0 INSPECTION REPORT <br /> 4.1 FOUNDATION <br /> 4.1.1 FOUNDATION INSPECTION CHECKLIST <br /> J # DESCRIPTION COMMENTS <br /> Y 1 Ins ect foundation for dams e. Reference Section 2.0 <br /> Y 2 Search for indications of bottom leakage. None found, Acceptable <br /> Y 3 Inspect for cavities and vegetation under Reference Section 2.0 <br /> foundation. <br /> Y 4 Check for proper water runoff and drainage Acceptable <br /> away from the tank. <br /> Y 5 Check for grade or other material covering the Acceptable <br /> shell-to-bottom junction. Detail findings. <br /> Y 6 Check for settlement around the perimeter of Reference Sections 2.0 and <br /> the tank. 4.1.2. <br /> N 7 Check for presence or condition of moisture NIA <br /> barrier. <br /> N 8 Check for anchorage. Record sizes, spacing NIA <br /> between anchors and condition. <br /> APIRFIME.POT REV 2 2626030418r.doo 412512008 10:09 AM <br />