Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORT* <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN— (Page 2 of 2 <br /> � MONITORING �heckQc <br /> VL UNDER DISPENSER CONTAINMENT")q hat 1 <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHODS) 490-sora. <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2_FLOAT AND CHAIN ASSEMBLY ❑ 3-ELECTRONIC STAND-ALONE 490-54b. <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) 490-56. <br /> 490-55. MODEL#:EMC <br /> LEAK MONITOR MANUFACTURER Gilbarco 490-57 4W58. <br /> LEAK SENSOR MANUFACTURER:Veeder Root MODEL#(s):2d8 <br /> ® 490-59- <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ® b.a_YES ❑ b.NO NO 49060. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 490.61. <br /> FAUXWjDLSCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. [I a.YES ® b.NO 490-62. <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER ❑ a YES ® b_NO <br /> ❑ 2 DOUBLE WALL 490-637� <br /> UDC CONSTRUCTION IS: ® 1.SINGLE WALL 490-64a <br /> IF DOUBLE WALL: <br /> UDC INTERSTTTIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> ago-6ab. <br /> A LEAK WTfHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES [Ib.NO . <br /> VII. PERIODIC SYSTEM TESTING <br /> ❑ 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED a9o-6 <br /> LEAK DETECTION(ELD)MUST BE PERFORMED- PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED-[23 CCR§2644.11 490-66. <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-67. <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. <br /> VIII RECORD KEEPING <br /> 490-6s. <br /> The following monitormg/mamtenaoce records are kept for tins Facility: <br /> ® a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting records) <br /> ® £ATG TESTING RESULTS(and supporting doamie�ran records) ❑ g.CORROSION PROTECTION 60 DAY LOGS <br /> ® h UIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> ® Personnel with UST monitoring response bilities are familiar with all of the following documerds relevant to their job duties a9069a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> 490-69b. <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490-69c. <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490-69d. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69e. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 49069E <br /> STATISTICAL INVENTORY RECONCILIATION" 490-69g- <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 49069L <br /> ❑ OTHER(Specify): 490 69i <br /> ® Council 490-70. <br /> This cility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code <br /> fa <br /> (ICC). The "Designated UST OperaW will tram faciilAy employees m the proper operation and maintenance of the UST systems annually,and within 30 <br /> days ofbire.This training will mclude,but is not limited to,the following: <br /> ➢ Operation ofthe UST systems in a manner consistent with the facility's best management practices- <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan_ <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> ➢ Name(s)of coulact person(s)for emergencies and momtnriog alarms. <br /> X. COMMEN T'SfADDITIONAL INFORMATION <br /> Provide additional oo®rents here or indicate how many pages with additional information on speeffic monitoring Procedures are attached to this plan 490-71. <br /> Overfill prevention=drop tubes with mechanical flappers set at 950/6 of tank capacity <br /> XL PERSONNEL RESPONS11BHX ES <br /> The UST OWner/Operator is responsible for Mining that 1.)the dailyhoutme UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this plan occurs;2.)all conditions that indicate a possible release are investigated;and 3_)all monitoring records are maintained pro�eerly---THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME- Neil Williams �'l <br /> TME-General Manager 490.75. <br /> NAME: Kevin Nickell 490.74. TITLE:Environmental Compliance Analyst 49°75. <br /> The Designated UST Operator shall perform a monthly visual mon of the facil t,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my Rowledge <br /> APPLICANT SIGNATURE G. -fir DATE: 490 77. <br /> ski�s 7/31/2009 <br /> REPRESENIIlIG O t.Tadc 7 FaaTLLy A dRepe eofCwarr 49076- <br /> 490 79. <br /> APPLICANT NAME(print.): APPLICANT TiTi E: <br /> C. Kevin Nickell Environmental Compliance Analyst <br /> UPCF UST-D(12/2007)-416 www.unidoes.org <br />