My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2001-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2001-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 9:49:31 AM
Creation date
11/1/2018 9:48:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2001-2006
FileName_PostFix
2001-2006
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE 2 <br />VI. DISPENSER MONITORING <br />MONITORING OF AREAS BENEATH DISPENSER(S) IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) Mso. <br />LY 1. CONTINUOUS ELECTRONIC MO�N+rITORING OF UN rRPISP LASER C NTAI{�MENT (UDC) <br />�-i� "'3 Ms". <br />PANEL MANUFACTURER: Gi bay O V ��� \� Mst. MODEL#: <br />LEAK SENSOR MANUFACTURER: Mss. MODEL #(S): L" 7'74 3 M-.2 CX M54. <br />WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? &YkYES ❑ b. NO Mss. <br />WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? Ly' a. YES ❑ b. NO M56. <br />❑ YES NO M57. <br />WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? a. Imo. <br />❑ 2. MECHANICAL ASSEMBLY (e.g., FLOAT AND CHAIN ASSEMBLY) IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br />ASSEMBLY MANUFACTURER: Mss. MODEL #(S): Ms9. <br />F13.VISUAL MONITORING DONE: Ela. DAILY Elb. WEEKLY (Requires agency approval) M60. <br />❑ 4. NO DISPENSERS <br />M61. <br />❑ 99. OTHER (Specify) <br />VII. ENHANCED LEAK DETECTION <br />❑ 1. WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK M70 <br />DETECTION (ELD) FOR THE UST(S) COVERED BY THIS PLAN. PER 23 CCR §2644.1, ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br />VIII. TRAINING <br />REFE CE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) Mso. <br />1. HIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) <br />2. OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) <br />3. ❑ THE FACILITY'S BEST MANAGEMENT PRACTICES (Required as of 1/01/2005) <br />4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />6. El STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS -MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION" <br />7. ❑ SWRCB PUBLICATION: "WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br />Msl <br />99. OTHER (Specify): <br />Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job duties and can access those documents when needed. <br />By January 1, 2005 this facility will have a "Designated UST Operator" who has passed the operator exam administered by the International Code Council (ICC). By <br />January 1, 2005, and annually thereafter, the "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems. <br />This training will include, but is not limited to, the following: <br />➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br />i The facility employee's role with regard to the leak detection equipment. <br />> The facility employee's role with regard to spills and overfills. <br />Whom to contact for emergencies and leak detection alarms. <br />For facility employees hired on or after January 1, 2005, the initial training will be conducted within 30 days of the date of hire. <br />IX. COMMENTS/ADDITIONAL INFORMATION <br />int auon e.g., additional i formation required by your local agency): Mss. <br />Please use this section to include any additional UST systemo iton rel to rm <br />99, <br />X. PERSONNEL RESPONSIBILITIES <br />AS OF 1/1/05, THE "DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION — <br />FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br />AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br />EQUIPMENT COVERED BY THIS PLAN, <br />UST SYSTEMS M ACCORDANCE WITH 23 CCR § 2715(b). <br />XI. ONVNER/OPERATOR SIGNATURE <br />CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br />Ff91 <br />OWNER/Of WTOR SIGNATURE a �. C A �j,�� , REPRESENTING <br />M- L ---C L--40- Y j -j' -4v �wner M90. <br />17 <br />DATE: <br />? ^ <br />— 7, - • n _ „ Q Operator <br />OWNER/OPERATOR NAME (print): <br />OWNER/OPERATOR TITLE: <br />(Agency Use Onl}q This plan has been wed and: Approved ❑ Approved With Conditions ❑ Disapproved <br />Date: -7.12 Z� <br />Local Agency Signature: — <br />Comments/Special Conditions: <br />A7/2-3/03 <br />SJCEHD-d (07/03) - 3/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.