Laserfiche WebLink
SWRCB, January 2002 <br />Page --I- of ja <br />Test Method Developed By <br />5kTiping Manufacturer 0 Industry Standard d Professional Engineer <br />11 Other (Specify) <br />vin e, <br />Test Method Used: <br />,S�fressurc <br />rJ Vacuum <br />D Hydrostatic <br />T� <br />n Other (Specify) <br />Test Equipment Used:'1e, 5 uµ r1 e <br />Equipment Resolution: <br />Piping Run #1 <br />Piping Run #L <br />Piping Run # 3 <br />Piping Run # +{ <br />Piping Material:� <br />� v 4 055 <br />Piping Manufacturer <br />Piping Diameter <br />t 1 <br />90 <br />t! <br />Length of Piping Run: <br />nx , Z5UA <br />3 7 p� <br />x .35d 1 <br />Product Stored: <br />17 i �5e L Z <br />( i eSeL a� Z <br />( <br />U,leat"Su <br />Method and location of <br />TPsi- baedreA- 5-1 P f <br />t-t-STF z <br />T�s+ ba.F-t+ 13 <br />r�,l b } AA- -f-9 Lt <br />piping -run isolation: <br />LA -H.,Zyrn <br />LA 00S '15 r-, K Z S <br />uoeS <br />005of A,u4,Islc,,,cl <br />Wait time between applying <br />pressu acuuiu/water and <br />sa m- test: <br />U►� ou✓ <br />DtnQ r,v✓ <br />�'MtiQ r,•, <br />bv.Q \n. at+✓ <br />Test Start Time: <br />2 '. v cv <br />�- = w <br />H ; t5 <br />Initial Reading (Rr): <br />S P SI: <br />S P S 1- <br />Test End Time: <br />3 `. o 0 <br />3'• v v <br />S: r5 <br />Final Reading (Itr): <br />Test Duration: <br />0 hQ ou ✓ <br />b <br />b <br />v� v <br />u ✓ <br />Change in Reading (RP -R,): <br />o GL- a,.-L�. <br />ew <br />U (-� t, . <br />p L-�,, Gti r <br />Pass/Fail Threshold or <br />% <br />. <br />Criteria: <br />Nu Lvss 51 <br />eJu Loss ivt P SZ <br />tip Less ;UOSt <br />n u Lo55 -O 1O5 1- <br />Test Result: <br />Pass. it Fail <br />;kp2m 'D.Fail <br />Pass Q' .uE <br />Pass <br />Comments - (include information on repairs made prior to testing and recommended follmuup forjailed tests) <br />vin e, <br />L( <br />J1ti�. le- L4 <br />T� <br />to C. <br />