Laserfiche WebLink
SWRCB, January 2002 <br />' ' ' Page � � of <br />9. SRUJOVERM[LL CON'T'AINMENT BOXES <br />[Fac�ilt�is Not Equip ed With S ilUOverfill Containment Boxes 0 <br />pOverf U Containment Boxes are Present, but wereMot Tested <br />est Method Developed By: ❑ Spill Bucket Manufacturer L Industry Standard YPTOfeSSional Engineer <br />O Other (Specify) <br />Test Method Used: ❑ Pressure tt Vacuum <br />,Hydrostatic <br />tl Other (Spec) <br />Test Equipment Used: <br />COMIII tits — ' Jude information on repairs a rior to testing, and recommended (ollow-u for jailed tests) <br />614c .13 is ed k v41 v An�rr a�/ n- ��r : v✓r3, , 4P4 -i i C a i Or <br />Equipment Resolution: <br />S iU Box # <br />P S <br />Spill Box #6 RV <br />Spill Box # 7 p F Spm p � <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time betweeymg <br />, <br />pressure/vacuu nd <br />starting test: <br />Test Start Time: <br />-- <br />Initial Reading <br />Test End Time: <br />Final Reading (RF): <br />mss' <br />Test Duration: <br />Change in Reading (Rr-R,): <br />Pass/Fail Threshold or <br />' <br />Criteria: <br />Test Result; <br />U Pass. - U Pail <br />tJ Prix U Fait <br />tJ Pass U Fail Li Pass - U fail <br />COMIII tits — ' Jude information on repairs a rior to testing, and recommended (ollow-u for jailed tests) <br />614c .13 is ed k v41 v An�rr a�/ n- ��r : v✓r3, , 4P4 -i i C a i Or <br />