Laserfiche WebLink
07/25/2003 10:15 7753584411 LA PERKS <br />i -..CSU � a. 36 <br />Test Method Developed By: <br />Test Method Uses: <br />Used for <br />Bucket Manufacturer: <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (RO: <br />Test End Time: <br />PAGE 03 <br />4. SPEULIOVERFML CONTAIl"MNT BOXES page 2 of <br />❑ Spill Bucket Manufacturer ❑ Industry Standard nProfessional <br />S <br />❑ Other eci Engineer <br />a Pressure o Vacuum ❑ Hydrostatic <br />❑ Other S eci <br />Testin : Incon TS -STS Sump Test System <br />Spill Boa # Diesel 1 Spill Box # Diesel a <br />Spill Boa # $7 #1 <br />OPW OPW OPW <br />10 %2" 10 'V1 <br />15" 1570 1519 <br />15 nein 15 min 15 min <br />9:39 <br />9:39 <br />9:39 <br />2.3135 <br />15 rain <br />2.1427 <br />2.3926 <br />9:54 <br />_0010 <br />9:54 <br />.0006 <br />9:54 <br />2.3129 <br />.002 <br />2.1417 <br />_002 <br />2.3920 <br />Test Duration: <br />Is min <br />15 min <br />15 rain <br />Change in Reading (RF -R : <br />.0006 <br />_0010 <br />.0006 <br />Pass/Tail Threshold: <br />.002 <br />_002 <br />.002 <br />Test Result: <br />Pan <br />Pan <br />Pass <br />Comments — include iafonTation on repairs made prior to testi <br />SWRCB <br />