My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2001-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2001-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 9:49:31 AM
Creation date
11/1/2018 9:48:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2001-2006
FileName_PostFix
2001-2006
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANoYcring System Certification <br /> Site Address: IS 3?j U oh u ?I Date of Testing/Servicin <br /> F. In-Tank Gauging/SIR Equipment: Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform lcalc detection monitoring. <br /> Complete the following checklist: <br /> OEQIYes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ No* Was accuracy of system product level readings tested? <br /> ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Co tete the ollowing checklist: <br /> Yes o* For equipment start-up or annual equipme rtification, was a leak simulated to verify LLD performance? <br /> N/A (Check all apply) Simulated leak rat; 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br /> YY <br /> No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No* Was the testing apparatus properly calibrated? <br /> es o* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ * For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> ❑ Yes ❑ NO* LFor <br /> ectronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> N/Aonnected? <br /> ❑ Yes ❑ No* lectronic LLDs, does Ilse turbine automatically shut off if any portion of the monitoring system <br /> N/Actions or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> N/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe flow and when these deficiencies were or will be corrected. <br /> H. Comments: �OT� I ESEI' <br /> GA'so `5 F4 ss . <br />
The URL can be used to link to this page
Your browser does not support the video tag.