Laserfiche WebLink
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: LOVES 1553 COLONY ROAD RIPON CA 95366 <br /> 27S. . . . . . . . <br /> 27. . . . . <br /> 28S. A=ANNULAR . . <br /> x F=FILL <br /> 26S. V=VAPOR <br /> El <br /> P=PROBE . . . . . <br /> . . . 26. T=TURBINE <br /> 24S. X=SENSOR <br /> x <br /> 24. . . . . . F <br /> 23S. DIE DIE 87 <br /> ax 23. O x <br /> 225. X � X O X P <br /> 22. <br /> IJJF 1 0 <br /> .21S. 87 <br /> 21. X O <br /> F <br /> . 91 <br /> O <br /> . . . . . . . . . . . O <br /> . . . . . . . . . T ❑x <br /> X x <br /> x <br /> . T <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 14.. 13. .10. 9. . . . .6. X 5. . . . . 2. E 1. <br /> X . . . . <br /> . . <br /> . . . <br /> . . <br /> . . . <br /> . . . . . . <br /> . . . . I . . . . . . . . . . . . . . <br /> . . . . . <br /> 16 15. .12. 11 . . 6. 7. . . . .4. .3. . . . . . <br /> x . . . . . . . . . . <br /> . . . . . . . . . . . . . . <br /> Date map was drawn: 8/11/11 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your s;te plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels,sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 <br /> Monitoring System Certification <br /> 2/21/07 <br />