Laserfiche WebLink
Woodward-Clyde <br /> Consultants <br /> s <br /> TABLE OF CONTEN'T'S <br /> Section Pace <br /> 10 INTRODUCTION 1-1 <br /> 1 1 SITE DESCRIPTION 1-1 <br /> 12 BACKGROUND 1-1 <br /> 13 PURPOSE 1-7 <br /> 14 SCOPE 1-7 <br /> 20 FIELD ACTIVITIES 2-1 <br /> 21 QUARTERLY GROUNDWATER MONITORING QUARTER <br /> ENDING DECEMBER 1991 2-1 <br /> 30 RESULTS 3-1 <br /> 3 1 QUARTERLY GROUNDWATER MONITORING 3-1 <br /> 3 1 1 Water Levels, Groundwater Flow Direction 3-1 <br /> 3 1 2 Analytical Results 3-1 <br /> 3 3 QUALITY ASSURANCE/QUALITY CONTROL 3-4 <br /> 40 SITE STATUS AND PLANNED ACTIVITIES 4-1 <br /> 41 STATUS OF INVESTIGATION AND CLEANUP <br /> ACTIVITIES 4-1 <br /> 42 PROPOSED CONTINUING OR NEXT PHASE OF <br /> INVESTIGATION 4-1 <br /> 43 METHOD OF CLEANUP PROPOSED OR IMPLEMENTED TO <br /> DATE 4-1 <br /> 44 TIME SCHEDULE FOR THE COMPLETION OF THE <br /> INVESTIGATION OF SITE OR REMEDIATION 4-2 <br /> 45 METHOD AND LOCATION OF DISPOSAL OF THE RELEASED <br /> HAZARDOUS SUBSTANCE AND ANY CONTAMINATED SOIL, <br /> GROUNDWATER OR SURFACE WATER 4-2 <br /> 46 MANIFEST REQUIRED FOR THE TRANSPORT OF <br /> HAZARDOUS SUBSTANCES 4-2 <br /> . <br /> 47 MONITORING WELL DATA INCLUDING GROUNDWATER <br /> ELEVATION, pH, CONDUCTIVITY AND GRADIENT 4-2 <br /> 91CO23MMAIORMART QRPTI02-18-92SAC -1- <br />