Laserfiche WebLink
INSTALLING A NEW DISPENSER <br />Always review the plans to ensure proper alignment. Contact <br />Bravo Systems if any alignment or spacing issues occur. <br />In some situations you may encounter existing conduits that are <br />located outside the existing UDC's opening / water splash. <br />YOU ARE NOT AUTHORIZED TO MODIFY THE CONVERSION <br />FRAME IN ANY WAY!! Contact Bravo Systems immediately at 800 -AT -BRAVO to <br />begin a factory evaluation and to obtain compliant directions tailored to your specific application. <br />Al - Remove existing dispenser from its mounting points. <br />A2 - Align and secure conversion frame to the island / concrete with minimum 1/2"o diameter bolts. <br />For Non -Bravo Sumps - A minimum of four (4) anchor bolts must be secured directly to concrete. <br />Use provided plastic caps to plug all concrete anchoring bolt holes after they are fastened. <br />Concrete anchoring bolts must not be corroded or compromised and should be embedded adequately. <br />Bravo does not provide or specify any min/max depth or bolt material or type for this application. <br />A3 - Pre -plumb all product inlets and vapor recovery line with offsets and/or rigid pipe and elbows <br />as necessary. Adjust electrical conduits to line up with the new dispenser as necessary. <br />A4 - Position and bolt down the dispenser to the conversion frame with the anchor bolts provided. <br />Dispenser <br />Dispenser <br />Anchor Bolt <br />Concrete <br />Anchor <br />Plate — <br />BRAVO BOX <br />FOR OLD <br />a d• J 4' , <br />DISPENSER <br />2 <br />G <br />BRAVO <br />OFFSET <br />BRAVO <br />OFFSET <br />, <br />Concrete Anchor <br />_......._... <br />Bolts <br />W AJ <br />Equipment shown is for <br />illustration purposes only <br />and is not a reference <br />- — <br />for your layout within <br />the hydraulic cabinet <br />ii -Conversion Frame -12A <br />