Laserfiche WebLink
INSTALLATION MATERIALS CHECKLIST <br />Tools & equipment ❑ offsets, elbows, nipples, unions, Etc.. <br />Concrete anchor bolts F-] Plastic caps (sow plugs) for nuts / bolts <br />Dispenser anchor bolts <br />* S. Bravo Systems, Inc. does not include Concrete Anchor Bolts with its Conversion Frames. <br />PRE -INSTALLATION CHECKLIST <br />Ensure that you have all your permits in order, including your Bravo Certification Card. <br />DConversion Frame is free of damage? <br />Physically check the Dispenser, Sump and Conversion Frame drawings before installation? <br />If either of the two scenarios below exist, call Bravo immediately at 323-888-4133 . <br />> The existing conduits are concreted in just outside the water splash lip. <br />> The existing conduits run vertically very close to the UDC's water splash lip or I.D. opening. <br />INSTALLATION CHECKLIST <br />Dispenser was carefully removed and any spills contained and cleaned up? <br />Drawings for all components are on-site and have been reviewed for any problems? <br />❑ Conversion Frame is bolted to the island or concrete with minimum 112"o bolts? <br />If a non -Bravo UDC is existing, were a minimum of 4 either existing or new anchor bolts <br />used to secure the conversion frame to the concrete? <br />❑ All electrical conduits are adjusted correctly to mate with the new dispenser? <br />All product inlets are pre -plumbed with approved offsets, elbows, pipe, etc..? <br />Dispenser was carefully lined up and securely bolted to the Conversion Frame? <br />Conversion Frame was inspected for dents or damage? <br />4 ii-ConversionFrame-12A <br />