My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
1833
>
2300 - Underground Storage Tank Program
>
PR0540845
>
REMOVAL 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2018 1:28:46 PM
Creation date
11/1/2018 10:54:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2016
RECORD_ID
PR0540845
PE
2361
FACILITY_ID
FA0023349
FACILITY_NAME
TSUTAOKA, MARY
STREET_NUMBER
1833
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03133009
CURRENT_STATUS
02
SITE_LOCATION
1833 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS\K\KETTLEMAN\1833\PR0540845\2016 REMOVAL.PDF
QuestysFileName
2016 REMOVAL
QuestysRecordDate
6/10/2016 7:13:28 PM
QuestysRecordID
3110772
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HVEU <br /> MAR 10 2016 <br /> BACKFILL EXCAVATION CERTIFICATE ENVIRONMENTAL <br /> '4r:AITu r1=80TAI.ICKIT <br /> Project Location: ���3 ���� 771�iW'd ��/ P� <br /> Owner /"; f/et/ �5�/f p�C� Phone No: 29 c/ <br /> Contractor: Phone No-.,2Z <br /> License No: <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project <br /> completion, or <br /> 2. Submission of verification, e.g., load ticket, within 30 days of project completion that <br /> one of the following materials was placed in the excavation in 'i2" lifts: <br /> A. Pea gravel--smooth, rounded material not more than one-half(1/2) <br /> �( inch in diameter <br /> //\B. Crushed rock--self-compacting material not more than three-quarters <br /> � 131t4) inch in cross sectional measurement. (Use of crushed rock will <br /> not be permitted for backfill if contact will be made between the <br /> backfill material and tanks/pipes made of poly resin glass or similar <br /> materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days <br /> of project completion, or submission of verification that the select material described above <br /> will be placed at a minimum of five (5) cubic yards per 1000 gallon tank displacement and <br /> that the entire excavation will be backfilled and compacted to insure compliance with the <br /> Uniform Building Code Appendix Chapter 70 <br /> "Name 0 <br /> tri n� <br /> TitleIJo��J l� <br /> ri n <br /> Signature <br /> "Shall be the responsible managing employee on the license or authorized agent. <br /> i0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.